People and site compliance

Daily activity briefing software for construction

Crate turns the daily activity briefing into a digital record your supervisors run at the start of each day. They build it from a template with the day's tasks, hazards and controls, attendees sign on a device, and every DAB is saved by site and date.

  • Built from your templates
  • Signed on a device
  • A PDF record for every briefing
Site manager in a hi-vis jacket delivering a daily activity briefing, beside a red, amber and green Crate chart tracking DABs on site
From a template

Start each DAB from a briefing template set up for the site.

Tasks, hazards and controls

Set out the day's work, with custom fields and attachments.

Signed on a device

Attendees sign, and the supervisor sees who has not.

Saved by site and date

Find any briefing by date and site, and download a PDF.

How a daily activity briefing works in Crate: one morning on Riverside Quarter

Follow one supervisor's DAB from the template to the start of work.

  1. 07:15

    The template is picked

    Mark Davies starts today's DAB in the site office from the groundworks template for Riverside Quarter. He sets out four tasks with their hazards and controls, and attaches a photo of Area B.

    Draft4 tasks, 4 hazards
  2. 07:30

    The briefing is delivered

    Mark talks the gang through the day's work by the welfare cabin. Operatives can follow the same briefing on their own phones, and sign on his tablet as he finishes.

    Briefing6 of 8 signed
  3. 07:38

    Everyone has signed

    Mark can see who has signed and who has not, so the last two are picked up before anyone heads out. All eight attendees are signed on.

    All signed8 of 8 signed
  4. 07:40

    Record saved, work starts

    The DAB is saved against Riverside Quarter and today's date, with every signature and attachment, ready to download as a PDF. The gang heads out to Area B.

    SavedPDF record ready

What is a daily activity briefing?

A daily activity briefing, or DAB, is a short briefing at the start of each day. The supervisor or site manager runs through the day's tasks, the hazards and the controls with everyone doing the work, and each person signs to say they were there.

On paper, it is a sheet on a clipboard in the cabin. Tasks get copied from yesterday, signatures are chased at break time, and the sheets end up in a box file nobody can search.

With Crate, supervisors build each daily activity briefing from a template, attendees sign on a device, and every DAB is saved against the site and the date.

What a DAB in Crate holds

  • The day's tasks and work areas
  • Hazards and the controls for each
  • Custom fields set up for your sites
  • Documents and photos attached
  • A signature from every attendee
  • Who briefed it, where and when

Records can be found by date and site, and downloaded as a PDF.

One daily activity briefing, from the template to the PDF

Site managers see the whole briefing and who has signed. Supervisors collect signatures on a device. Every day ends with a record.

The whole briefing on one screen

Each DAB shows the day's tasks, the hazards and controls, your custom fields and any attachments, beside a sign-on list with the time each person signed. Pick a date and site to find any briefing.

See who still needs to sign

The supervisor's sign-on screen shows who has signed and who has not, so nobody heads out without signing. Operatives can also open the briefing on their own device.

  • Signed and not signed at a glance
  • Signatures captured on a device
  • The briefing on operatives' own phones

A dated record for every briefing

Every DAB produces a PDF record with the site, date and time, who briefed it, the tasks, the hazards and controls, and every attendee's signature.

  • Tasks, hazards and controls in full
  • Every signature, with its time
  • Saved by site and date

Sign the daily activity briefing by QR code

A briefing should take minutes, not a queue for one tablet. Crate gives your team two ways to sign each DAB, and both keep the same record.

Supervisor app

Scan their passport, sign on one screen

The supervisor scans each operative's passport QR code in the supervisor app, then everyone signs on the supervisor's screen. No sign-in sheet and no typing names.

Their own phone

Scan the QR code, sign on their own phone

Operatives scan the QR code with their own phone and sign the daily activity briefing from their passport in the Crate app, all at the same time.

Less queuing

Scan and sign on one screen, or let the whole team sign at once on their own phones.

The same record, either way

Both routes save the signed daily activity briefing, with each person's name and the time they signed.

On their own phone, in their passport

Every signed daily activity briefing shows in the operative's passport, so they can view the record on their own phone at any time.

Daily activity briefings in their own language

Not everyone on site has English as a first language. Operatives can open the daily activity briefing on their own phone, translated into their own language, and read along as the supervisor delivers it.

Afterwards, the signed record stays in their passport, so they can look back at what was covered at any time.

  • Translated into the operative's own language
  • Read along on their own phone as it is delivered
  • The signed record on their own phone afterwards

Workers need to know today's risks and controls

Under CDM 2015, a contractor must give each worker under their control appropriate supervision, instructions and information so the work can be done safely. The Management of Health and Safety at Work Regulations 1999 add that employers must give employees comprehensible and relevant information on the risks and the preventive and protective measures.

A daily activity briefing is how many sites pass that information on as the work changes each day. A dated record with every signature shows it happened, and supports the evidence you keep under the Building Safety Act.

A DAB is one part of how you inform and supervise workers. It does not replace your RAMS or the site induction. Take advice on what your sites need.

"A contractor must provide each worker under their control with appropriate supervision, instructions and information so that construction work can be carried out, so far as is reasonably practicable, without risks to health and safety."

Construction (Design and Management) Regulations 2015, regulation 15(8)
Regulation 15CDM 2015: supervision, instructions and information for every worker
Regulation 10Management Regulations 1999: information on risks and the measures that control them

Last updated October 2026

What to cover in a daily activity briefing

A starting point for your own DAB template. Keep it short and specific to today's work.

TopicWhy it matters
Today's tasks and work areasMakes sure everyone knows what they are doing today, and where.
Hazards and controlsLinks each task to its hazards and the controls in the RAMS, in plain words.
Who is working whereShows which gangs and trades are in each area, and where their work overlaps.
Plant movements and deliveriesWarns people where vehicles and plant will be moving, and when.
Permits in forceFlags work that needs a permit today, such as hot works or confined spaces, and its limits.
Weather and ground conditionsCovers wind, rain, heat or ice that change how the work is done.
Changes since yesterdayPicks up new hazards, closed routes or changes to the plan.
Emergency arrangementsReminds everyone of the assembly point, the first aiders and how to raise the alarm.

A daily activity briefing works alongside your RAMS and site induction. It does not replace them.

Paper DAB sheets versus daily activity briefings in Crate

The same morning briefing, with a record that is complete before work starts.

QuestionPaper DAB sheetsDaily activity briefings in Crate
Building the briefingCopied by hand from yesterday's sheetStarted from a briefing template for the site
Hazards and controlsSqueezed into a box on the formListed in full, alongside the day's tasks
Drawings and photosPinned up in the cabin, if anywhereAttached to the briefing as documents and photos
SignaturesChased round the site at break timeSigned on a device, with anyone unsigned shown
Operatives' viewWhatever they remember from the cabinThe briefing on their own device
Finding a recordBox files sorted by whoever had timeFiltered by date and site, with a PDF record
Site manager briefing a group of construction workers on site, with the Crate daily activity briefing attachments screen shown alongside

The same information in front of everyone

Supervisors attach documents and photos to each daily activity briefing, such as a drawing of the work area or a photo of the excavation, so everyone briefed sees the same thing. The DAB is saved against the site and date with its attachments and signatures.

  • Documents and photos attached to the briefing
  • A signature from everyone briefed
  • Saved against the site and date

Questions about daily activity briefings

Straight answers to what construction teams ask us most.

What is a daily activity briefing?

A daily activity briefing, or DAB, is a short briefing at the start of the day where a supervisor or site manager runs through the day's tasks, hazards and controls with the people doing the work. In Crate, each DAB is built from a template and signed by everyone who attended.

What is the difference between a DAB and a toolbox talk?

A daily activity briefing covers today's work on one site: the tasks, hazards and controls for that day. A toolbox talk is a short talk on a single safety topic, such as working at height or manual handling, and is not usually tied to one day's tasks.

Is a daily activity briefing a legal requirement?

The law does not name the DAB. Regulation 15(8) of CDM 2015 requires contractors to give each worker appropriate supervision, instructions and information, and regulation 10 of the Management of Health and Safety at Work Regulations 1999 requires employers to tell employees about the risks and the measures that control them. A daily briefing is a common way to meet those duties as the work changes. Take advice on what your sites need.

Who delivers the daily activity briefing?

Supervisors or site managers deliver it at the start of the day, for each site. They start it from a briefing template set up for the site.

Can we add our own fields and attachments?

Yes. Briefing templates can include custom fields, and supervisors can attach documents and photos, such as a drawing or a photo of the work area.

How do attendees sign a daily activity briefing?

Two ways. The supervisor can scan each operative's passport QR code and everyone signs on the supervisor's screen, or operatives scan the QR code with their own phone and sign in the Crate app. The supervisor sees who has signed and who has not, and each signed DAB shows in the operative's passport.

Can operatives follow the briefing in their own language?

Yes. Operatives can open the daily activity briefing on their own phone, translated into their own language, and read along as it is delivered. The signed record then stays in their passport.

How do we find an old DAB?

Records can be filtered by date and site, and each DAB can be downloaded as a PDF record with its tasks, hazards, controls and signatures.

Every morning briefed, every signature on record.

Book a demo and we'll show you how a daily activity briefing runs in Crate, from the template to the PDF record, using your own sites and templates.

Book a demo