Digital Waste Tracking software for UK waste operations.
Wasteify helps waste receiving sites and operators capture the information needed for Digital Waste Tracking as part of the real operational workflow. Keep EWC codes, carriers, sites, weights, vehicles and supporting evidence connected instead of rebuilding the record after the load arrives.

England & Wales receiving sites
Permitted and licensed waste receiving sites must report controlled waste they receive through the Report Receipt of Waste service.
Scotland & Northern Ireland
The mandatory receiving-site phase begins for permitted and licensed receiving sites in Scotland and Northern Ireland.
Waste collectors
The current government timetable brings waste collectors, including carriers, brokers and dealers, into the mandatory service.
Capture the information at the point it exists.
The reporting window starts on the day after the waste is received. If a submission error is returned, it must be corrected within the same two-working-day timeframe.

The reporting record should start when the vehicle arrives.
Gatekeepers and receiving teams are closest to the information DEFRA needs. Wasteify keeps the arrival, inspection, weighment, acceptance and site evidence around the same transaction instead of handing another form to the office.
What does a receiving site actually need to report?
Current government guidance covers movement, carrier and receiver details, classification, recovery or disposal information and additional data for hazardous waste and persistent organic pollutants.
Digital Waste Tracking should not become another admin process.
Wasteify keeps information captured by the office, driver and receiving site attached to the same movement so your team is not recreating the record after the job is complete.


Do not make the back office re-key what the site already knows.
The operational record should already contain the customer, carrier, driver, vehicle, material, site, weight and evidence by the time the office reviews it.
Digital Waste Tracking does not mean your existing duty-of-care records vanished.
The current paper-based waste tracking method initially runs alongside the new digital service. Waste Transfer Notes, Annex VII forms and hazardous waste consignment notes still continue where required.


Built for yards, transfer stations, recycling facilities and receiving sites.
The information is created in operational environments, not in a quiet office after the event. That is why the receiving workflow needs to be fast, structured and usable by the people actually handling the load.
API or DEFRA spreadsheet. The operational data still has to be right.
Government guidance supports two reporting routes for receipt-of-waste data. Organisations can also use a combination of the two methods.
Compatible software via API
Waste-specific software can connect to the Report Receipt of Waste API when it meets the relevant government integration and approval requirements.
- Structured digital submission
- Organisation-specific API code
- Software must meet the required approval route
DEFRA spreadsheet upload
Organisations without compatible API software can use DEFRA's prescribed receipt-of-waste spreadsheet and upload completed movement data.
- Use DEFRA's template
- Multiple movements can be included before submission
- A new spreadsheet is needed after submission
October 2027 brings waste collectors into the mandatory phase.
The current timetable brings waste collectors, including carriers, brokers and dealers, into Digital Waste Tracking from October 2027. Structuring collection data now makes that later transition far less disruptive.



Who does Wasteify support around Digital Waste Tracking?
Receiving & recycling sites
Capture incoming loads, carriers, materials, weights and site evidence.
Gatekeepers & weighbridges
Record the event while the vehicle is physically at the gate.
Waste carriers
Structure collection records now ahead of the October 2027 collector phase.
Construction & demolition
Connect site, carrier, waste and receiving evidence across project movements.
Brokers & subcontract haulage
Keep multiple organisations and hand-offs around the same movement history.
Back-office teams
Review and report structured movement data without re-keying field records.
Digital Waste Tracking is one part of the waste record.
The questions receiving sites and waste operators are actually asking.
This section deliberately covers the operational and regulatory questions around reporting, deadlines, errors, outages, WTNs, hazardous waste, software and the 2027 collector phase.
What is Digital Waste Tracking?
Digital Waste Tracking is the UK programme introducing more consistent digital records for waste movements. The current mandatory phase focuses on permitted and licensed waste receiving sites, with waste collectors following in a later phase.
Who must use the Report Receipt of Waste service in England and Wales?
Organisations that are permitted or licensed to receive controlled waste generally need to report the loads they receive. The requirement applies to permitted operations, installations and mobile plants, subject to the exceptions set out in current government guidance.
When did reporting become mandatory for receiving sites in England and Wales?
The mandatory receiving-site phase began on 1 October 2026 for permitted and licensed sites in England and Wales.
When does the receiving-site phase start in Scotland and Northern Ireland?
The current timetable brings permitted and licensed receiving sites in Scotland and Northern Ireland into the mandatory service from 1 January 2027.
When do waste carriers, brokers and dealers have to use Digital Waste Tracking?
The current government timetable brings waste collectors, including carriers, brokers and dealers, into the mandatory Digital Waste Tracking service from October 2027.
How quickly must a receiving site report a load?
Records normally need to be submitted within 2 working days, excluding weekends and bank holidays, starting on the day after the waste is received.
What happens if the service rejects a submission?
If you receive an error notification for a submission, current guidance requires you to correct it within the same 2 working day reporting timeframe.
What if I discover an error after the record has already been accepted?
Errors discovered later should be corrected as soon as possible and, under current guidance, always within one month of discovering the error.
What information does a receiving site need to report?
The required data includes waste movement, carrier and receiver details, waste classification codes, recovery or disposal information and additional data where the waste is hazardous or contains persistent organic pollutants.
What is an EWC or List of Waste code?
It is the six-digit classification code used to identify a waste type. Government guidance also refers to these as List of Waste or LoW codes.
Do hazardous waste and POPs need extra information?
Yes. Hazardous waste can require hazardous-property information and component concentrations. Waste containing persistent organic pollutants can also require the relevant substance names and concentrations.
Do Waste Transfer Notes still need to be completed?
Yes, where they are required. The current waste transfer and duty-of-care processes continue alongside the new receiving-site service until further notice. Hazardous waste consignment notes and Annex VII forms also continue where applicable.
Do waste returns and hazardous waste consignee returns still continue?
Yes. Current government guidance says existing waste returns and hazardous waste consignee returns continue during the transition to the new service.
Can I report using software instead of the government spreadsheet?
Yes. The service supports API submission through compatible waste-specific software. DEFRA also provides a prescribed spreadsheet route for organisations that do not use compatible software.
Can I use both the API and the spreadsheet?
Yes. Government guidance says organisations can use a combination of the API and spreadsheet submission methods.
Can I upload my own spreadsheet template?
No. If you use the spreadsheet route, you need to use DEFRA's prescribed receipt-of-waste template rather than your own spreadsheet format.
What happens if there is an outage?
If an outage prevents submission, current guidance requires a written record to be made and retained within the normal reporting window, with the information transferred to the service after the outage is resolved within the specified recovery period.
What if a business is digitally excluded?
A separate written-record process is available for people who meet the formal definition of digital exclusion and hold the required digitally excluded number. Simply preferring paper or being unfamiliar with software does not qualify.
Are household waste recycling centres exempt?
There are specific household waste recycling centre exceptions in current guidance. For example, certain household waste deposited by residents at qualifying HWRCs is outside the reporting requirement.
How much does the government Report Receipt of Waste service cost?
Current GOV.UK guidance states that the service costs £26 per year for each organisation on the account and covers all waste-receiving sites belonging to that organisation. The first payment is due by 31 January 2027.
Does Wasteify submit directly to DEFRA?
Wasteify is designed to capture the structured operational information needed for Digital Waste Tracking. The available submission route depends on the current integration and approval status for your setup, so confirm the live reporting route with Crate before relying on direct API submission.
Why use Wasteify if DEFRA provides a spreadsheet?
The government spreadsheet is a reporting route. Wasteify is designed to capture the operational information during the real movement, connecting customers, carriers, vehicles, sites, weights, evidence and related records so the reporting data does not have to be rebuilt afterwards.
See how Wasteify fits your receiving or waste operation.
Show us how waste is received, moved and recorded today. We will show you where Wasteify can remove duplicate entry and create a cleaner digital movement record.