Wasteify by Crate blue

Free Waste Transfer Note Template (UK)

Download a free, compliant waste transfer note template for non-hazardous waste in England and Wales. Choose the print version to complete by hand, or the fillable version you can type into and save. Both are free to use, no sign-up needed.

Download print template (PDF)

Download fillable template (PDF)

Prefer it done for you? Create a digital waste transfer note online and have it emailed instantly.

Complete this short form and receive the access link and code, so you can use our – free to use digital waste transfer note, that emails you and your customers a copy in real-time.

Free waste transfer note template for non-hazardous waste, England and Wales

Access Request for free-to-use eWTN

What must a waste transfer note include?

A compliant waste transfer note must include every field below. Tick them off as you complete your note.

Required fields completed 0 of 9
Description of the waste
What the waste actually is, in plain terms
EWC code
The six-digit European Waste Catalogue code
Quantity
Weight or volume of the waste
How it is contained
Loose, or the type of container used
SIC code of the transferor
2007 Standard Industrial Classification code
Both parties' details
Names, addresses and company names of transferor and transferee
Role of each party
Producer, holder, carrier or disposer
Carrier registration number
Registration number of the carrier taking the waste
Place, date and signatures
Where and when the transfer happened, signed by both parties
All required fields covered. Your waste transfer note is compliant.

Non-hazardous waste, England and Wales. Required under the Environmental Protection Act 1990 and the Waste (England and Wales) Regulations 2011. Both parties must keep a copy for at least two years. Hazardous waste requires a hazardous waste consignment note instead.

Stop filling in paper notes altogether

Wasteify generates a compliant digital waste transfer note automatically for every job, built from the job, company, driver and customer details, and emails it straight to your customer. No paper, no typing, no missed fields. Wasteify is £39 per user, per month, with no sign-up fee and no lengthy contract.

Social Share - Wasteify. App for Waste carriers and skip companies