Construction time and attendance: knowing who is on site, and paying them right

Construction time and attendance is how a site records who is on site, when they arrived and left, and the hours they get paid for. It sounds like admin. It is also the list you read out at the assembly point when the fire alarm goes, and the one payroll argues over on a Friday.

By G. Wicks, Crate & Wasteify FounderUpdated 20 October 20269 minute read
Operative scanning a QR code to complete a site induction in Crate

The short answer

  • Construction time and attendance means recording who is on site and when, for two reasons: safety, so everyone can be accounted for in an emergency, and pay, so hours and timesheets are right.
  • No law requires a particular sign-in system. But CDM 2015 requires emergency arrangements, including evacuation, and the Working Time Regulations 1998 require records that show working time limits are met, kept for two years.
  • Biometric clocking uses special category data under UK GDPR. The ICO says you must complete a data protection impact assessment before using a biometric recognition system.
Contents
  1. What is time and attendance?
  2. Does the law require it?
  3. Who is on site in an emergency
  4. Timesheets and agency workers
  5. Working time records
  6. Sign-in methods compared
  7. Biometric clocking and UK GDPR
  8. How to set it up
  9. Common mistakes
  10. Paper or digital?
  11. Sources

What is time and attendance in construction?

Time and attendance answers two questions. Who is on site right now? And how many hours did each person work? The first is a safety question. The second is a pay question. Most sites answer both from the same site sign-in, and that is where the trouble starts, because the two jobs need different things.

Safety needs a live list, right to the minute, that includes visitors, delivery drivers and the surveyor who popped in for an hour. Pay needs hours per person per day, signed off and matched to the right employer, agency or subcontractor.

Get one system doing both properly and you save a lot of Friday afternoons. Get it wrong and you end up with a sign-in book that is no use in a fire and timesheets nobody trusts.

Knowing who is on site when the alarm goes

Picture the fire alarm going at two in the afternoon. Everyone walks to the assembly point. The supervisor reads the list. Two names do not answer.

Now the questions start. Did they sign in this morning and leave at lunch without signing out? Are they the dryliners who turned up at ten and never went near the cabin? Or are they still inside? Somebody may have to go back in and look, and that decision rests on how good your list is.

CITB guidance on fire evacuation calls for "effective methods of accounting for everyone on site", and says drills should test "the effectiveness and accuracy of roll calls". On a real site that means:

  • One controlled way in and out, so the list matches reality
  • Everyone signs in, including visitors, delivery drivers and anyone on site for an hour
  • Signing out is enforced as firmly as signing in
  • The list goes to the assembly point with the person running the roll call
  • Drills check the roll call as well as the evacuation time

A sign-in book is not much use at the assembly point when it is still on the desk in the cabin that is on fire.

Timesheets, agency workers and paying people right

On most sites the pay side runs on construction timesheets. Agency workers fill in a sheet, a supervisor signs it, and the agency invoices you and pays the worker from it. Subcontractors on day rates work much the same way.

The weak point is the signature. A supervisor signing twenty timesheets at four o'clock on a Friday is not checking hours. They are signing paper. Most weeks that is fine. When it is not, you pay for hours nobody worked, or a worker is short and you hear about it on Monday.

The fix is to check timesheets against attendance. If the gate says someone arrived at 8.40 and the timesheet says 7.30, you have the conversation before the invoice arrives. It protects workers too. A clean attendance record settles a pay dispute faster than anyone's memory.

Working time records: what the law asks for

The Working Time Regulations 1998 set limits including an average 48-hour week, unless a worker has opted out, and limits on night work. Employers must keep records that show they are sticking to them. Acas lists what those records need to prove:

  • Nobody works more than the 48-hour weekly maximum unless they have an opt-out agreement
  • The limits on night working are being met
  • Night workers have been offered regular health assessments
  • Young workers are not working during restricted periods

Acas also says "An employer does not need to keep records of all daily working hours", and "Employers must keep these records for 2 years from the date they were made."

Minimum wage rules go further. Gov.uk says records that show you pay at least the minimum wage must be kept for at least six years. Most employers use payroll records for that, which brings it straight back to the hours recorded in the first place. For agency workers these duties usually sit with the agency that pays them, but the hours still come from your site.

Sign-in books, swipe cards, biometrics and QR compared

There are four common ways to run site sign-in. Plenty of sites end up with a mix.

MethodHow it worksGood forWatch for
Sign-in bookA book or sheet in the cabin or at the gate. Name, company, time in, time out.Cheap. Needs no power, no signal and no training.Names nobody can read, forgotten sign-outs, one person signing for the gang. And it gets wet.
Swipe cards or fobsA card or fob at a reader or turnstile logs each entry and exit.Accurate times. Works with turnstiles and gates.Cards get lent and lost. It records that a card went in, not who carried it. Needs power, readers and someone to issue cards.
Biometric terminalsFingerprint or face recognition at a clocking unit or turnstile.Hard to fake. The person has to be there.Special category data under UK GDPR. Needs a data protection impact assessment first, and an alternative for anyone who says no if you rely on consent. Dust and gloves do not help either.
App or QR sign-inPeople scan a QR code with a phone, or have their code scanned at the gate.No hardware beyond a printed code. A live list on a phone. Can link to the person's other records.Needs a phone and some signal. Have a fallback for the worker without either.

Whichever you choose, the test is the same. Could you read the list out at the assembly point in the next two minutes?

Biometric clocking and UK GDPR

Biometric clocking is popular for one reason. Nobody can clock in for a mate. But fingerprints and faces come with legal weight.

The ICO says biometric data used "for the purpose of uniquely identifying someone" is special category data under UK GDPR. You need a lawful basis and a separate condition for processing it, and the ICO is clear about the data protection impact assessment, or DPIA: "You must complete a DPIA before you use a biometric recognition system."

Consent is awkward at work, because staff may not feel free to say no. The ICO calls this "particularly an issue for public authorities and employers". Where you do rely on consent, it says "You must also offer a suitable alternative to people who choose not to consent."

The ICO has acted on this. In February 2024 it ordered Serco Leisure and seven associated trusts to stop using facial recognition and fingerprint scanning to check the attendance of more than 2,000 employees at 38 leisure facilities. It found the processing was not necessary or proportionate when there were "less intrusive means available such as ID cards or fobs".

Biometrics are not banned. But if a card or a QR code does the job, you will struggle to argue a fingerprint was necessary. The ICO says its biometric guidance is under review following the Data (Use and Access) Act, so check the current version before you buy.

How to set up time and attendance on a site

The kit matters less than the routine around it. Seven steps cover most sites.

  1. Decide what it is for

    Safety, pay or both. Write down who needs the data and why. It shapes the system you choose, and it is the first question data protection law will ask.

  2. Control the way in

    One gate, or as few as you can manage. An attendance list is only as good as the fence around it.

  3. Tie sign-in to induction

    No induction, no entry. If someone is not on the inducted list, they should not be on the attendance list either.

  4. Make signing out part of the shift

    Remind people at the end of the day, and check who still shows as on site before the gates are locked.

  5. Get the live list to the assembly point

    Whoever runs the roll call needs the current list in their hand, on paper or on a phone, within a minute of the alarm.

  6. Check hours every week

    Compare attendance with timesheets before they are signed and invoiced, not after a dispute.

  7. Tell people what you record

    Explain what is recorded, why and who sees it, as part of the induction.

Common time and attendance mistakes

Most attendance problems are habits, not technology.

  • Forgotten sign-outsThree names on the list who went home at lunch turn a roll call into a search.
  • Signing in for matesOne person signs for the gang. Fine, until the gang is not all there.
  • Leaving visitors offThe delivery driver in the yard counts. So does the surveyor who is only there for an hour.
  • Two records that never matchThe gate says one thing, the timesheets another, and nobody compares them until an invoice is disputed.
  • Biometrics first, questions laterBuying the terminals and then asking the data protection questions is the wrong way round.
  • Data nobody looks atA turnstile log that nobody reads is a very expensive door.

Paper book or digital site sign-in?

A paper book works on a small job with one gate and a careful supervisor. It struggles everywhere else. Names you cannot read, sign-outs nobody remembers, and a list nobody can see from anywhere but the cabin.

In Crate, attendance is recorded by QR code and site managers get a live view of who is on site. For the hours and pay side, Crate integrates with Go2Clock for time and attendance.

See how Crate shows who is on site, live, on every site you run.Time and attendance in Crate

Sources

  1. Construction (Design and Management) Regulations 2015, regulation 30, legislation.gov.uk
  2. Construction (Design and Management) Regulations 2015, regulation 13, legislation.gov.uk
  3. Fire evacuation and escape planning, CITB
  4. Working Time Regulations 1998, regulation 9, legislation.gov.uk
  5. Working time rules, Acas
  6. The National Minimum Wage and Living Wage: employers, gov.uk
  7. Biometric data guidance: biometric recognition, ICO
  8. ICO orders Serco Leisure to stop using facial recognition technology, ICO

Time and attendance questions

The questions site teams ask us most, answered straight.

What is time and attendance in construction?

Time and attendance in construction is the record of who is on site, when they arrived and left, and the hours they worked. It is used for safety, so everyone can be accounted for in an emergency, and for pay.

Is a site sign-in book a legal requirement?

No law requires a sign-in book specifically. But CDM 2015 requires emergency arrangements, including evacuation procedures, and requires the principal contractor to take steps to prevent unauthorised access, so you need a reliable way of knowing who is on site.

How long do working time records need to be kept?

Acas says records under the Working Time Regulations must be kept for two years from the date they were made. Records that show you pay the minimum wage must be kept for at least six years.

Can I use fingerprint clocking on a construction site?

You can, but biometric data used to identify people is special category data under UK GDPR. The ICO says you must complete a data protection impact assessment first, and if you rely on consent you must offer a suitable alternative.

Do visitors and delivery drivers need to sign in?

Yes. Anyone on site needs to be on the list, or your roll call will not be accurate in an emergency.

Why does signing out matter?

A roll call is taken from the list of who is still on site. Someone who left without signing out shows as missing, and people may be sent back in to look for them.

Do I have to record every hour worked?

Acas says employers do not need to keep records of all daily working hours under the Working Time Regulations, but they must be able to show the limits are met. In practice you need the hours anyway to pay people and check timesheets.

What is the difference between time and attendance and access control?

Access control decides who can get onto site, usually with gates or turnstiles. Time and attendance records who was there and for how long. Many systems do both.

Know who is on site, not just who signed the book.