Construction training records: how to keep track of cards, tickets and expiry dates

Construction training records are the cards, certificates and expiry dates that show each person on site is trained for the work they are doing. Keeping them is easy. Keeping them current is where most firms come unstuck, usually on the morning a MEWP operator turns up with a card that ran out in March.

By G. Wicks, Crate & Wasteify FounderUpdated 20 October 202610 minute read
Site supervisor checking an operative's training on a tablet as he steps down from a scissor lift on a UK construction site

The short answer

  • Construction training records are the evidence that each worker holds the cards and certificates their job needs, such as CSCS, CPCS or NPORS, IPAF, PASMA, SMSTS or SSSTS, first aid and asbestos awareness.
  • UK law requires employers to provide adequate health and safety training and to make sure anyone using work equipment is trained to use it (MHSWR 1999 regulation 13, PUWER 1998 regulation 9). The record is how you prove it.
  • Check cards on CSCS Smart Check rather than by eye, record every expiry date, and book renewals before tickets run out, not after.
Contents
  1. What counts as training records?
  2. Does the law require them?
  3. Competence under CDM 2015
  4. Common cards and what they show
  5. How to check a CSCS card
  6. Staying on top of expiry dates
  7. What to record
  8. Common mistakes
  9. Spreadsheet or digital?
  10. Sources

What counts as construction training records?

A training record is any evidence that a person has been trained for a task. On a UK site that usually means a card or certificate from a recognised scheme, and a note of when it runs out. The usual ones:

  • CSCS card, the basic card most sites ask for at the gate
  • CPCS or NPORS plant cards for excavators, dumpers, telehandlers and the rest
  • IPAF PAL card for MEWPs such as scissor lifts and booms
  • PASMA for mobile access towers
  • SMSTS for site managers and SSSTS for supervisors
  • First aid at work certificates
  • Asbestos awareness training

Then there is the training that never comes with a plastic card. Manufacturer training on a specific machine, abrasive wheels, harness inspection, in-house courses. It all counts. If someone was trained, write it down. If nobody wrote it down, good luck proving it.

Training records are also only part of your competence records. Experience, supervision and site inductions sit alongside them, and an inspector looking at an accident will want all of it.

Training and competence under CDM 2015

The Construction (Design and Management) Regulations 2015 talk about skills, knowledge, training and experience. Regulation 8 says a contractor appointed to a project must have the skills, knowledge and experience to do the work safely, and anyone appointing a contractor must "take reasonable steps to satisfy themselves" that it does. Regulation 15 brings it down to individual workers.

"A contractor must not employ or appoint a person to work on a construction site unless that person has, or is in the process of obtaining, the necessary skills, knowledge, training and experience to carry out the tasks allocated to that person in a manner that secures the health and safety of any person working on the construction site."

Construction (Design and Management) Regulations 2015, regulation 15(7)

Training is one of four things on that list. A card shows someone passed a course. It does not show they have tracked a 360 along a slope next to an open excavation. That is experience, and you find it out by asking, watching and supervising.

The words "in the process of obtaining" matter too. Trainees and apprentices can work on site with proper supervision. Your records should show who they are and who is supervising them.

Common construction cards and what they show

These are the cards and certificates UK sites ask for most. Each scheme sets its own rules, so treat the validity column as a guide and go by the date on the card.

CardWhat it showsHow long it lastsWatch for
CSCS cardOccupation and level, by colour. Green labourer, blue skilled worker, gold advanced craft or supervisor, black manager, white qualified professional, red trainee or still qualifying.Most cards last five years. Red cards are time limited and cannot be renewed.Check it on CSCS Smart Check, not by eye.
CPCSThe plant categories an operator is trained on. Red trained operators work under supervision. Blue competent operators also hold the NVQ.Red: two years, not renewable. Blue: five years, renewable.Check the category covers the machine on the job, not just that they hold a card.
NPORSPlant categories, from a different scheme. The CSCS-logo cards come as red trained operator and blue competent operator.Red: two years. Blue: five years.Check which plant schemes your principal contractor accepts.
IPAF PAL cardThe MEWP categories the operator is trained on, such as scissor lifts and booms.Five years. Renewals must be done before the expiry date.Check the categories cover the machine on site.
PASMATrained to put up, move, take down and inspect mobile access towers.Renew before the expiry date shown on the certificate.A tower built by someone untrained is a tower nobody should climb.
SMSTSSite Management Safety Training Scheme, the CITB course for site managers.Five years. Refresher course before it runs out.Common requirement for anyone running a site.
SSSTSSite Supervision Safety Training Scheme, the CITB course for supervisors.Five years. Refresher course before it runs out.Often asked for before someone can lead a gang.
First aid at workThe holder is a qualified workplace first aider.Three years. HSE strongly recommends an annual refresher.Check you have enough first aiders on every shift, not just on paper.
Asbestos awarenessThe holder can recognise asbestos and knows not to disturb it. It does not qualify anyone to work on asbestos.No fixed expiry. HSE says some form of refresher should be given, as necessary.Many contractors ask for a yearly refresher.

Scheme rules change. Check the scheme's own website if a card looks unfamiliar or a date looks wrong.

How to check a CSCS card properly

Most CSCS card checks are still done by eye at the gate. CSCS is blunt about that: "Visual checks aren't enough to spot fake, fraudulently obtained, or revoked cards."

2.3m

Cards carrying the CSCS logo, across every scheme in the CSCS Alliance. CSCS Smart Check can verify all of them, and the app and website are free to use.

CSCS, Smart Check frequently asked questions

CSCS says cards should be verified regularly using CSCS Smart Check. It confirms whether a card is genuine, valid and in date, and shows the holder's name, photo, occupation and qualifications. When you check a card:

  • Check the face matches the photo. It sounds obvious. It gets skipped when there is a queue at the gate.
  • Check the card type fits the job. A labourer card does not cover operating plant.
  • Check the categories. A card for a forward tipping dumper does not cover a telehandler.
  • Check the expiry date.
  • Run it through Smart Check.
  • Record that you checked it, when, and who did it.

A fake card in someone's wallet is their problem. A fake card you accepted without checking becomes yours.

How to stay on top of training expiry dates

Tickets run out. It is the one thing about them you can predict, and it still catches sites out every week. A simple routine fixes most of it.

  1. Collect it before day one

    Get cards and certificates before someone starts, not at the gate. Pre-enrolment is the time to spot a ticket that runs out next month.

  2. Record the expiry, not just the card

    A copy of a card with no date written against it is a photo, not a record. Every entry needs the course, the date achieved and the expiry date.

  3. Look ahead every month

    Review what runs out in the next 90 days. IPAF says PAL card renewals must be done before the expiry date. Miss it and the operator goes back on the full course.

  4. Book refreshers early

    Courses fill up. A day off site for a refresher booked six weeks out is cheap. Finding out on the morning of the lift is not.

  5. Stop expired tickets at the point of work

    An expired card means that person should not be doing that task until it is renewed. Have the conversation before the job starts, not halfway through it.

  6. Check again when the work changes

    New role, new machine, new method. Regulation 13(2) of MHSWR says that is exactly when new training is due, so check the record covers what they are about to do.

What should training records include?

Whatever system you use, each record should answer the questions an inspector, a client or a principal contractor will ask:

  • Full name and employer, including the agency or subcontractor
  • Course or card name, with the category or level where there is one
  • Scheme or training provider, and the card or certificate number
  • Date achieved and expiry date
  • A clear copy of both sides of the card, or the certificate
  • When it was checked, how, and by whom
  • Any refresher or renewal booked

Keep records per person, not per course. When the site manager asks whether someone can go up in the scissor lift, the answer should take ten seconds, not a rummage through three folders.

No law sets one retention period for all training records. Your procedures, contracts and insurers usually will. Training records are personal data too, so data protection law applies. Keep what you need, for as long as you need it.

Common training record mistakes

Most training record problems come down to the same few habits.

  • A photocopy in a drawerIt proves the card existed on the day it was copied. It says nothing about whether it is still in date.
  • Checking cards by eyeFakes are good enough to pass a glance at 7am. Smart Check exists for a reason.
  • One spreadsheet, one personIt works until that person goes on holiday. Then nobody knows who is in date.
  • Finding out on the dayThe MEWP is on site, the gang is waiting and the operator's PAL card ran out last Tuesday.
  • Treating a card as competenceA ticket shows training. It does not show someone has done the task on a job like yours.
  • Leaving agency records with the agencyIf the worker is on your site, you need to have seen the evidence. "The agency has it" is not an answer that goes down well after an accident.

Spreadsheet or digital training records?

A spreadsheet is fine for ten people on one site. Past that it goes stale. Dates get typed wrong, copies live in someone's inbox, and nobody updates the sheet when a worker sends a new certificate over WhatsApp.

In Crate, training records sit on each worker's passport: the course, the dates, the expiry and a copy of the certificate. Workers upload their own cards from their phone, and admins can bulk upload for a whole gang. Once a worker submits a record they cannot edit it, but an admin can. Every certificate shows as valid, expiring or expired, so you can see who needs a refresher before it becomes a problem at the gate.

Crate holds the record. Checking a card is genuine is still a job for CSCS Smart Check.

See how Crate keeps cards, certificates and expiry dates for every worker.Training in Crate

Sources

  1. Management of Health and Safety at Work Regulations 1999, regulation 13, legislation.gov.uk
  2. Provision and Use of Work Equipment Regulations 1998, regulation 9, legislation.gov.uk
  3. Construction (Design and Management) Regulations 2015, regulation 8, legislation.gov.uk
  4. Construction (Design and Management) Regulations 2015, regulation 15, legislation.gov.uk
  5. Check cards, CSCS
  6. CSCS Smart Check: frequently asked questions, CSCS
  7. What are the different types of CSCS card?, Go Construct (CITB)
  8. What are CPCS cards?, Go Construct (CITB)
  9. CPCS Blue Competent Operator Card, CPCS
  10. NPORS CSCS Trained Operator Card and Competent Operator Card, NPORS
  11. How do I renew my PAL Card when it expires?, IPAF
  12. How do I receive my PASMA certification?, PASMA
  13. CITB SSSTS course overview, Construct
  14. Workplace first aid questions, St John Ambulance
  15. Asbestos training, HSE

Training record questions

The questions site teams ask us most, answered straight.

What are construction training records?

Construction training records are the evidence that each worker holds the training their job needs, such as CSCS, CPCS, NPORS, IPAF and PASMA cards, plus SMSTS, SSSTS, first aid and asbestos awareness certificates. A good record shows the course, the date achieved, the expiry date and a copy of the card.

Is it a legal requirement to keep training records?

No UK law says keep a training record in those words. But MHSWR 1999 requires adequate health and safety training, PUWER 1998 requires training for anyone using work equipment, and CDM 2015 requires the necessary skills, knowledge, training and experience. A record is how you show you met those duties.

How do you check a CSCS card is genuine?

Use CSCS Smart Check, the free app and website from CSCS. CSCS says visual checks are not enough to spot fake, fraudulently obtained or revoked cards.

Does a CSCS card prove someone is competent?

No. A card shows training and qualifications. CDM 2015 also expects the right experience for the task, so check that too and supervise until you are sure.

How long is an IPAF card valid?

An IPAF PAL card is valid for five years. IPAF says renewals must be done before the expiry date, or the operator has to take the full course again.

How long should training records be kept?

No single law sets one retention period for all training records. Follow your company procedures, contracts and insurers, and keep personal data only as long as you need it under data protection law.

What should happen when a worker's training expires?

They should not do work that needs that training until it is renewed. Track expiry dates ahead of time so refreshers are booked before the card runs out.

Who keeps training records for agency and subcontract workers?

Their employer holds the originals, but CDM 2015 says a contractor must not appoint anyone to work on site without the necessary skills, knowledge, training and experience. Check the evidence yourself and keep a copy.

Know who is in date before they reach the gate.