Fleet guide

Vehicle walkaround checks: what to check and how to report defects

A vehicle walkaround check is the daily check a driver makes around a lorry, bus or van before using it, looking for defects that make it unsafe or illegal to drive. DVSA expects at least one every day the vehicle is used, with every defect written down and reported. It takes minutes, and DVSA can ask to see the record at any roadside check.

By G. Wicks, Crate & Wasteify FounderUpdated 20 October 20269 minute read
Tipper lorry walkaround check in Crate showing good working order and a reported defect

The short answer

  • A vehicle walkaround check is a visual and functional check of a vehicle by the driver, or another responsible person, before it is used on the road.
  • DVSA guidance says at least one walkaround check must be carried out every day, or at least once in each 24-hour period the vehicle is used, and a vehicle must not be driven with a dangerous defect.
  • Every defect is reported in writing to a responsible person, nil defects are recorded too, and driver defect reports must be kept for at least 15 months.
Contents
  1. What is a vehicle walkaround check?
  2. Is it a legal requirement?
  3. What to check
  4. How to do it
  5. Reporting defects
  6. Who signs off repairs
  7. Safety inspection intervals
  8. Vans and light vehicles
  9. Common failures
  10. Paper or digital?
  11. Sources

What is a vehicle walkaround check?

It is exactly what it sounds like. Before the vehicle goes out, the driver walks round it and checks it is safe and legal to drive: lights, tyres, brakes, mirrors, load, coupling and anything else that could fail on the road.

DVSA publishes walkaround guidance for lorries and for buses and coaches, and its Guide to maintaining roadworthiness sets out how operators should run the whole system. The same principles apply to the tippers, grab lorries, crew vans and pick-ups running in and out of construction sites every day.

A walkaround check is not a safety inspection. Safety inspections are planned, detailed inspections by a competent inspector at fixed intervals. The walkaround catches what turns up in between.

What to check on a vehicle walkaround check

DVSA's walkaround guidance runs to 27 items for lorries. Grouped by area, this is what drivers should be checking.

AreaWhat to checkTypical defects
Cab and controlsWindscreen, wipers and washers, mirrors and cameras, dashboard warning lights, steering, horn, seatbelts, height markerA crack in the wiper sweep, a warning light on, play in the steering, the wrong height displayed
Brakes and airAir pressure builds correctly, no audible leaks, service and parking brakes work, footwell clearSlow air build-up, a leaking line, a parking brake that will not hold
Lights and markingsLamps, indicators and stop lamps working, clean and the right colour, reflectors, rear markings and warning plates in placeBlown bulbs, cracked lenses, missing or hidden markings
Tyres and wheelsAt least 1mm tread on HGV tyres, correct pressures, no deep cuts or exposed cord, wheel nuts secure, nothing trapped between twin wheelsCord showing, a bulge, a loose wheel nut, a brick between the twins
Body, load and couplingDoors, panels, side and under-run guards and spray suppression secure, load stable and secured, trailer coupling and secondary locks engaged, number plate clean and legibleAn insecure load, a damaged guard, a plate hidden under mud
Fluids, leaks and powerNo fuel or oil leaks, filler cap secure, AdBlue topped up, battery secure, no excessive exhaust smoke, and for electric or gas vehicles, the cut-off switch located and workingA diesel leak under the tank, a missing filler cap, heavy smoke
Bus and coach extrasDoors and emergency exits, exit hammers, fire extinguisher, first aid kit where required, wheelchair space and boarding rampAn exit that will not open, a discharged extinguisher, a ramp that will not deploy

Based on DVSA's HGV and bus and coach walkaround guidance. Add anything specific to your vehicles, such as tipper bodies, sheeting systems or a lorry loader crane.

How to do a walkaround check properly

A good walkaround is quick because it is a habit, not because corners are cut.

  1. Start in the cab

    Engine on. Check the warning lights, steering, horn, wipers, mirrors and seatbelt, and watch the air pressure build.

  2. Walk round the same way every time

    Front, nearside, rear, offside. The same route every morning means nothing gets missed because you started somewhere different.

  3. Listen as well as look

    DVSA suggests leaving the engine running while you check the brake lines, so air leaks are easier to hear.

  4. Check the load and the coupling

    Secure for the road, not just for the yard. Fifth wheel located, secondary locks in place.

  5. Write it down, even when nothing is wrong

    A nil defect report is the proof that the check was done.

  6. Report defects before you drive

    In writing, to the person responsible for defects. If a defect is dangerous, the vehicle stays where it is until it is fixed.

How to report defects and nil defects

DVSA says drivers must report defects in writing to the person in charge of vehicle defects. That covers defects found on the walkaround and anything that develops during the day. A driver defect report should record:

  • The vehicle registration or fleet number, and the date
  • Details of the defect or its symptoms
  • The driver's assessment of it, for example dangerous
  • The name of the person reporting it, and who it was reported to
  • The repair carried out, and the date it was completed

If something goes wrong on the road, stop somewhere safe, assess it and report it. A dangerous defect has to be fixed before the vehicle goes any further.

Nil defect reporting

A nil defect report records that the check was done and nothing was found. DVSA's guide says "A 'nil' defect reporting system demonstrates a check has been conducted", and recommends keeping nil reports for at least 3 months. Defect reports, with details of the repair, must be kept for at least 15 months.

Without nil reporting, a vehicle that was checked and a vehicle that was not look exactly the same on paper.

Who signs off vehicle repairs?

Every defect needs an owner, a repair and a record. DVSA's guide spreads the job like this.

WhoResponsibilityRecord
DriverDoes the walkaround check, reports every defect in writing, and does not drive with a dangerous defectWalkaround record and defect report
Responsible personReceives defect reports, with the authority to act on them, including taking the vehicle off the roadDefect report with the action taken
Repairer or maintenance providerFixes the defect and records the work. Safety inspection records carry a signed declaration that defects have been repaired and the vehicle is roadworthyRepair record and signed inspection sheet
Transport managerReviews the completed safety inspection record before the vehicle goes back into service, and keeps legal responsibility when tasks are delegatedReviewed inspection record
Operator licence holderKeeps vehicles fit and serviceable, runs safety inspections at the frequency declared on the licence, and has a system to take unroadworthy vehicles off the roadMaintenance records kept for at least 15 months

The point is that nobody drives a vehicle back into service on an assumption. Someone with authority knows the defect was fixed, and the paperwork shows it.

How often should safety inspections happen?

The walkaround sits between safety inspections, and DVSA says those "would normally range between 4 to 13 weeks". The right interval depends on the vehicle's age, type, load and the conditions it works in. DVSA's guide gives these as a starting point.

Operating conditionsTypical inspection interval
Off-road or difficult conditions4 weeks
Arduous work4 to 6 weeks
Vehicles and trailers 12 years old or more6 weeks
General haulage6 to 10 weeks
Light loads in easy conditions10 to 13 weeks

Whatever interval you choose is declared on your operator licence, and inspections must happen at that frequency. Safety inspection records must be kept for at least 15 months. Tippers and grab lorries that spend their days on unmade site roads belong in the harder categories, not the easy ones. If you hire or borrow vehicles, DVSA also expects a first use inspection when they arrive, separate from the driver's walkaround.

Vans and light commercial vehicles

Most vans sit outside operator licensing, but that does not let them off. HSE says employers should make sure drivers "carry out and record daily vehicle checks and take any actions needed", that there are procedures for reporting defects, and that there is "a clear policy that unsafe vehicles should not be driven". That applies to privately owned vehicles used for work too.

DVSA says the principles in its roadworthiness guide can equally apply to light goods vehicles, and publishes a defect report template for them. Vans over 2.5 tonnes and up to 3.5 tonnes that need a standard international operator licence must be maintained in line with the guide.

On construction work, vans and pick-ups take a beating: kerbs, potholes, a full load of kit every day. A couple of minutes on tyres, lights, mirrors and the load catches most of what goes wrong.

Common walkaround check failures

Most failed systems fail in the same few ways.

  • Ticking boxes from the cabA sheet completed in thirty seconds without leaving the seat is a signature, not a check. DVSA says operators can use tachograph data to see how long walkaround checks actually take.
  • No nil reportingIf nothing is written down on a good day, there is no proof the check happened.
  • Defects reported in the yard, not in writingA word with the fitter is not a defect report. If it is not recorded, it did not happen.
  • The same defect on five reports runningNothing says the system is broken quite like a defect carried for a fortnight.
  • Nobody with the authority to stop a vehicleSomeone has to be able to say that lorry is not going out today, and be backed when they do.
  • Forgetting the kit on the backTipper bodies, sheeting systems and lorry loader cranes need checking too. A lorry loader is lifting equipment, so it also needs thorough examination under LOLER.

Paper defect books or a walkaround check app?

Paper defect books work until the book is in the cab of the lorry that is in the workshop, or the carbon copy goes missing. DVSA is relaxed about format. Records can be manual, electronic or a mix, and its guide says "Electronic driver defect reporting systems can be effectively used to manage drivers' walkaround inspections."

In Crate, drivers complete daily walkaround checks on their phone, from checklists you configure, with photos and a driver confirmation. Defects are captured on the spot with photos and a severity, then go to the workshop for review and close-out. Each vehicle in the fleet register has its documents, service schedule and maintenance history in one place, and drivers can show proof of inspection at the roadside.

See how daily walkaround checks work in Crate, from the driver's phone to the workshop.Walkaround checks in Crate

Sources

  1. Carry out daily heavy goods vehicle (HGV) walkaround checks, DVSA, gov.uk
  2. Carry out bus or coach daily walkaround checks, DVSA, gov.uk
  3. Guide to maintaining roadworthiness: commercial goods and passenger carrying vehicles, DVSA, gov.uk
  4. Keeping commercial vehicles safe to drive (roadworthy), with defect report and inspection templates, DVSA, gov.uk
  5. Goods Vehicles (Licensing of Operators) Act 1995, section 13C, legislation.gov.uk
  6. Make sure vehicles used to drive or ride for work are safe, HSE

Walkaround check questions

The questions drivers and transport managers ask us most, answered straight.

What is a vehicle walkaround check?

A vehicle walkaround check is a daily check of a vehicle by the driver, or another responsible person, before it is used on the road. It covers lights, tyres, brakes, mirrors, warning lights, load security and anything else that could make the vehicle unsafe.

How often must a walkaround check be done?

DVSA says at least one walkaround check must be carried out every day, or at least once in each 24-hour period the vehicle is used. Vehicles on arduous or off-road work may need more than one.

How long should a walkaround check take?

DVSA does not set a time, but its guide says enough time should be allowed to do the check properly. Operators can use tachograph data to see how long drivers actually spend on it.

What is nil defect reporting?

Nil defect reporting means recording that a check was done and no defects were found. DVSA recommends keeping nil defect reports for at least 3 months.

How long must driver defect reports be kept?

At least 15 months, together with details of the repair work. Safety inspection records must also be kept for at least 15 months.

Who signs off a vehicle defect repair?

Defects go to a responsible person with the authority to act, including taking the vehicle off the road. Repairs are recorded, and safety inspection records include a signed declaration that defects have been repaired and the vehicle is roadworthy.

Do vans need daily walkaround checks?

Most vans are outside operator licensing, but HSE says employers should make sure drivers carry out and record daily vehicle checks and act on what they find. DVSA says the same principles can apply to light goods vehicles.

Can walkaround checks be done on an app?

Yes. DVSA says walkaround checks can be documented on manual, electronic or hybrid systems, and that electronic defect reporting systems can be used to manage them.

Walkaround checks done properly, with the proof in the cab.

Book a demo and we'll show you vehicle walkaround checks in Crate, from the driver's checklist to the workshop close-out, using your own fleet.

Book a demo