Waste carrier licence: upper tier, lower tier and how to register
A waste carrier licence is the registration a business needs to transport waste as part of its work, or to buy, sell or arrange the disposal of waste. In England it comes in two tiers: lower tier, which is free, and upper tier, which costs £191.02 and covers anyone carrying other people's waste or any construction and demolition waste. Officially it is a registration, not a licence. Nobody on site calls it that.

The short answer
- You need a waste carrier licence, properly called a registration, if your business transports waste, or buys, sells or arranges the disposal of waste. You register with the environment regulator for the nation your business is based in.
- Lower tier is free and never needs renewing. It covers businesses carrying only their own waste, charities, councils and a few specialist waste types. Construction and demolition waste always needs upper tier, even when it is your own.
- Upper tier in England costs £191.02 and must be renewed every 3 years for £130.25. Carrying waste without registering can mean an unlimited fine.
Contents
What is a waste carrier licence?
A waste carrier licence is an entry on the public register of waste carriers, brokers and dealers. In England the Environment Agency keeps the register, and each registration has its own number.
The register covers three roles. A carrier transports waste. A dealer buys, sells or disposes of waste. A broker arranges for someone else to do it. Your registration records which roles you carry out, and plenty of skip and grab hire firms do all three.
The name causes confusion. The law and the regulators talk about waste carrier registration. Everyone else says licence. Same thing.
Do you need a waste carrier licence?
If your business moves waste, almost certainly. The offence has been on the books since 1989:
"it shall be an offence for any person who is not a registered carrier of controlled waste, in the course of any business of his or otherwise with a view to profit, to transport any controlled waste to or from any place in Great Britain."
Control of Pollution (Amendment) Act 1989, section 1(1)
Brokers and dealers are covered by regulation 25 of the Waste (England and Wales) Regulations 2011, which says "No person may act as a broker of or dealer in controlled waste unless registered".
In plain English: if you carry waste as part of your work, or deal in it or broker it, you need to be on the register. That includes a builder taking away old sinks and baths, a fencing contractor taking away old fences, and a letting agent arranging a clearance, who is acting as a broker. Householders taking their own household waste to the tip do not need to register.
The penalty for not registering in England is an unlimited fine. Your customers carry risk too. Under the duty of care in section 34 of the Environmental Protection Act 1990, anyone passing waste on must make sure it goes to an authorised person, and a registered carrier is one.
This is general guidance, not legal advice. Take advice on how the duties apply to your business and your projects.
Upper tier or lower tier waste carrier licence?
The tier depends on what you carry and whose waste it is. Pick the wrong one and you are not properly registered for the work you do.
| Compare | Lower tier | Upper tier |
|---|---|---|
| Who it is for | Businesses carrying only their own waste, charities and voluntary organisations, councils working in their own area, and businesses handling only animal by-products, mine or quarry waste or farm waste | Anyone carrying other people's waste, anyone carrying construction or demolition waste, and most brokers and dealers |
| Construction and demolition waste | Not covered, even when it is your own | Needed, even when it is your own |
| Examples | A gardener taking away green waste, a carpet fitter taking away old carpet, a tyre fitter taking away old tyres | A builder taking away old baths and sinks, a fencing contractor removing old fences, skip and grab hire firms |
| Cost in England | Free | £191.02 to register |
| Renewal | Never needs renewing | Every 3 years, £130.25 |
| Changing tier | Cannot be upgraded. Moving up needs a new upper tier registration | New registration at £191.02 |
The construction rule catches a lot of people out. Construction and demolition waste includes waste from improvement, repair and alteration work: rubble, plasterboard, old doors, radiators, baths, sinks, toilets and fencing. A plumber who strips out an old bathroom and takes it away in the van is carrying construction waste. Upper tier.
How much does a waste carrier licence cost?
In England, at the time of writing (October 2026), the Environment Agency charges:
- Lower tier registration: free
- Upper tier registration: £191.02
- Upper tier renewal, every 3 years: £130.25
- Changing what your business does, for example moving from carrier to broker: £49.62
- A new registration when your business type legally changes, such as sole trader to limited company, or when moving from lower to upper tier: £191.02
Lower tier registrations do not expire. Upper tier registrations last 3 years, so renew before the expiry date. Let it lapse, and until you are registered again you are carrying waste unregistered.
Fees change. Check the regulator's own site before you pay.
How to register as a waste carrier
Registering online is quick. Getting the tier right takes more thought.
Work out your role and tier
Carrier, broker, dealer or a mix of the three. Then lower or upper tier, using the table above. Any construction or demolition waste means upper tier.
Get your details together
If waste is your main business, you will need the names and dates of birth of the directors, partners or owners, details of any environmental offences, and a debit or credit card.
Register with the right regulator
The Environment Agency in England, Natural Resources Wales, SEPA in Scotland or NIEA in Northern Ireland. Register where your business is based, and register directly. The Environment Agency has warned that third-party sites offering to do it for you are not connected to it and may charge more.
Put your number to work
It goes on your waste transfer notes, and customers will ask for it. The good ones will check it.
Diary the renewal
Upper tier registrations last 3 years. Put the expiry date somewhere you will see it, not on a certificate in a drawer.
Report changes within 28 days
New director, new address, new activity, or someone in management convicted of an environmental offence. The Environment Agency can remove registrations that carry wrong information.
Scotland, Wales and Northern Ireland
Registration is separate in each nation, and you register with the regulator where your business is based.
| Nation | Regulator | How it works |
|---|---|---|
| England | Environment Agency | Lower tier free. Upper tier £191.02, renewed every 3 years for £130.25. |
| Wales | Natural Resources Wales | The same upper and lower tiers. Upper tier £184, renewed every 3 years for £126. Lower tier free. |
| Scotland | SEPA | Since 1 November 2025, transporting waste and acting as a broker or dealer are registered under the Environmental Authorisations (Scotland) Regulations 2018. Transporting your own waste has its own registration. Not registering can mean a fine of up to £5,000. |
| Northern Ireland | NIEA | Upper tier £180 new and £90 to renew. Lower tier free for specified bodies and businesses. Carrying controlled waste unregistered can mean a fine of up to £5,000. |
Figures from each regulator's website in October 2026.
How to check a waste carrier licence
If you hand waste to someone else, the duty of care means checking they are allowed to take it. The government's code of practice says "You should check whether a person or business is authorised to take waste before you transfer your waste to them", and to use the public register to check any evidence they give you.
- Get the registration number, not just a photo of a certificate
- Search the public register by number, business name or postcode
- Check the name on the register matches the business on the quote, the invoice and the side of the lorry
- Check they are an upper tier waste carrier if they are carrying your waste, and always for construction waste
- Check the expiry date, and check again at renewal on long contracts
- Keep a record of the check with the job
In England, the register is the Environment Agency's public register of waste carriers, brokers and dealers, or you can call 03708 506 506. A carrier who cannot give you a number, or gives you someone else's, is telling you something. Usually that the cheap quote was cheap for a reason.
Waste carrier licences, transfer notes and digital waste tracking
Your registration number does not sit in a drawer. Every waste transfer note has to record each party's "relevant authorisation to act in that capacity". For a carrier, that is the registration number. Transfer notes for non-hazardous waste must be kept for 2 years. Our guides on what a waste transfer note is and how to fill one in cover the detail.
Digital waste tracking takes it further. Under the Digital Waste Tracking (England) Regulations 2026, in force from 1 October 2026, operators of permitted sites that receive waste must record each load digitally, including the transporter's name and registration or authorisation number. So your number sits in the digital record of every load you tip. See what digital waste tracking means for waste carriers, and our Environment Agency waste inspection checklist for what to have ready if they visit.
What is changing in England?
The carrier, broker and dealer system in England is being replaced. The Environmental Permitting (Waste Controlling or Transporting) and Relevant Functions of Primary Authorities (Amendment) (England) Regulations 2026 were made on 22 July 2026 as SI 2026/873, and most of the changes come into force 12 months after that, so expect summer 2027.
When they do, registration is replaced by environmental permits or registered exemptions for waste controlling and transporting. Existing upper tier registrants need a permit or exemption from the day after their current registration was due to expire. Lower tier registrants get 12 months to register an exemption or apply for a permit. Defra's policy paper also sets out technical competence requirements for permit holders.
Until then, the current system applies. Keep your registration in date and renew on time. The changes apply to England only.
Paper or digital transfer notes?
Most of the risk in waste paperwork is dull: a transfer note with the wrong registration number, a missing signature, a pad left in the cab of the wrong lorry. Checking a licence is a five-minute job. Getting the paperwork right on every job, every day, is the hard part.
Wasteify by Crate is built for skip, grab, tipper and receiving site operators. Jobs are scheduled as one-off, recurring or call-off work, and the driver app works offline. Digital waste transfer notes are built from the job, so nobody rewrites the details by hand. Quick Jobs and thermal tickets handle loads at the gate, skips and containers are tracked on a map, and customers, quotes, price books, invoicing and payments sit in the same system. Receiving sites get support for digital waste tracking.
Sources
- Register or renew as a waste carrier, broker or dealer (England), gov.uk
- Control of Pollution (Amendment) Act 1989, legislation.gov.uk
- Waste (England and Wales) Regulations 2011, Part 8, legislation.gov.uk
- Environmental Protection Act 1990, section 34, legislation.gov.uk
- Waste duty of care: code of practice, gov.uk
- Register as a waste carrier, broker or dealer at GOV.UK, Environment Agency blog
- Public register of waste carriers, brokers and dealers, Environment Agency
- Deciding if you are a waste carrier, broker or dealer and register or renew, Natural Resources Wales
- Waste transporters and brokers, SEPA
- Registration of carriers and brokers, Department of Agriculture, Environment and Rural Affairs, Northern Ireland
- Reforming the waste carrier, broker and dealer system, Defra, gov.uk
- SI 2026/873 parliamentary record, including the date made, UK Parliament
- Environmental Permitting (Waste Controlling or Transporting) and Relevant Functions of Primary Authorities (Amendment) (England) Regulations 2026, legislation.gov.uk
- Digital Waste Tracking (England) Regulations 2026, legislation.gov.uk
Waste carrier licence questions
The questions waste carriers and their customers ask us most, answered straight.
Do I need a waste carrier licence to carry my own waste?
Yes, but usually a free lower tier registration that never needs renewing. The exception is construction or demolition waste, which needs an upper tier registration even when it is your own.
Is construction waste upper tier?
Yes. Anyone transporting construction or demolition waste needs an upper tier registration, including builders and trades taking away waste from their own jobs.
How much does a waste carrier licence cost in England?
Lower tier registration is free. At the time of writing, upper tier costs £191.02 to register and £130.25 to renew every 3 years.
How long does a waste carrier licence last?
An upper tier registration lasts 3 years and must then be renewed. A lower tier registration does not need renewing.
How do I check a waste carrier is registered?
Search the Environment Agency public register of waste carriers, brokers and dealers by registration number, business name or postcode, or call 03708 506 506. Check that the name matches the business you are dealing with, and that the registration is upper tier and in date.
What is the fine for carrying waste without a licence?
In England you can get an unlimited fine for not registering. In Scotland and Northern Ireland the maximum fine for not registering is £5,000.
Which regulator do I register with?
The regulator for the nation your business is based in: the Environment Agency in England, Natural Resources Wales, SEPA in Scotland or NIEA in Northern Ireland.
Is the waste carrier licence being replaced?
In England, yes. Regulations made in 2026 will replace carrier, broker and dealer registration with environmental permits or registered exemptions, with upper tier registrants moving across when their current registration runs out.
Run your waste business in Wasteify
Your registration is the start. The jobs, transfer notes and tracking come every day after it.
Wasteify by Crate
Scheduling, an offline driver app and digital transfer notes.
Digital waste transfer notes
Transfer notes built from the job, not rewritten by hand.
Digital waste tracking
Digital waste tracking support for receiving sites.
What is a waste transfer note?
What it must include and how long to keep it.
The right paperwork on every load.
Book a demo and we'll show you Wasteify, from scheduling the job to the digital transfer note, using your own yard and customers.