What is a site induction? What to cover and what CDM 2015 says

A site induction is the briefing everyone gets before they first work on a construction site, covering that site's rules, risks, emergency arrangements and welfare. Under CDM 2015 the principal contractor must make sure a suitable one is provided. Done well, it is the most useful hour anyone spends on a new job. Done badly, it is a video filmed before the crane went up.

By G. Wicks, Crate & Wasteify FounderUpdated 20 October 20268 minute read
Site manager delivering a site induction to four operatives in a site office, with a Crate attendance list showing who has been inducted

The short answer

  • A site induction is a briefing on one site's rules, risks, emergency arrangements and welfare, given to everyone before they first work there.
  • It is a legal duty. Under CDM 2015 the principal contractor must ensure a suitable site induction is provided, and contractors must provide one to their own workers where the principal contractor has not.
  • Keep it specific to the site, make sure people understand it, and record who was inducted, when and on which version.
Contents
  1. What is a site induction?
  2. Is it a legal requirement?
  3. Site induction checklist
  4. Visitors and workers
  5. How to deliver one
  6. When to re-induct
  7. Multilingual inductions
  8. What to record
  9. Common mistakes
  10. Paper or digital?
  11. Sources

What is a site induction?

A site induction is the briefing someone gets before they first start work on a particular site. It tells them how that site works: the rules, the risks, where to go in an emergency, where the welfare is and who is in charge.

The important word is site. An induction for a city-centre basement dig should sound nothing like one for a housing estate on a greenfield plot. HSE says inductions should be site-specific, highlight the particular risks on that site and explain how they are controlled.

It is not the same as a business induction, which introduces someone to their employer. A labourer might do one business induction in five years and dozens of site inductions.

Site induction checklist: what to cover

HSE lists the issues to consider for a site induction, and its site rules guidance adds the topics most sites need. Put together, a site induction checklist looks like this.

TopicWhat to cover
The projectWhat is being built, what stage the job is at, and how the project is managed
Who is in chargeThe site manager and supervisors, senior management's commitment to health and safety, and each worker's own responsibility
Site rulesPPE, phones and radios, smoking, restricted areas, hot works, permits to work and keeping the site tidy
Particular risksThe hazards on this site right now, such as excavations, work at height, lifting or live services, and how each one is controlled
Traffic and accessTraffic management, pedestrian routes, deliveries, parking and how to get on and off site
EmergenciesFire prevention, alarms, escape routes, assembly points and emergency arrangements
First aid and reportingFirst-aid arrangements and first aiders, and how to report accidents, incidents and near misses
WelfareToilets, washing, drinking water, and where to rest, eat and dry clothes
Briefings and consultationHow workers will be briefed from here on, such as daily briefings and toolbox talks, and how they are consulted on health and safety
Signing in and outHow attendance is recorded, so the site knows who is on it if the alarm goes

Keep the general company material out. That belongs in the business induction. Every minute spent on the holiday policy is a minute not spent on the excavation by the site entrance.

Site inductions for visitors and workers

HSE says inductions should also be given to people who visit occasionally, such as architects, and to one-off visitors, such as students. A site induction for visitors should be proportionate to the visit. Escorted visitors only need to know the main hazards they may be exposed to and the control measures. Unescorted visitors need more.

WhoWhat they needTypical approach
Operatives and supervisorsThe full site inductionBefore they start work, and again when the site changes
Regular unescorted visitors, such as surveyors and inspectorsEnough to move around safely alone: hazards, rules, emergencies and restricted areasA visitor induction covering where they will go
Escorted visitorsThe main hazards they may be exposed to and the control measuresA short briefing on arrival, and an escort the whole time
Delivery driversWhere to go, where to stay, traffic rules and who to report toA briefing or rules sheet at the gate

Whoever it is, record it. If the alarm goes, the person counting heads at the assembly point needs to know the client's surveyor is somewhere on level three.

How to deliver a site induction that works

Most people remember one thing from a bad induction: how long it took. These steps help with the rest.

  1. Make it about this site

    Use photos and drawings of this site, this month. Point out what will actually hurt someone here: the open excavation, the crane's slew zone, the live road outside the gate.

  2. Get the timing right

    Induct before the person starts work, not halfway through the morning. Book new starters in, so a supervisor is not inducting one person at a time all day.

  3. Have the right person give it

    Someone who knows the site and can answer questions about it, usually the site manager or a supervisor. Not whoever happens to be free.

  4. Walk it if you can

    A short walk to the assembly point, the first-aid kit and the welfare beats describing them on a slide.

  5. Check understanding

    Ask people where the assembly point is, or what they would do if they hit an unexpected service. A room full of nods tells you nothing.

  6. Record it properly

    Each person signs for themselves, against the version they were given. Check their cards while you have them.

When should you re-induct?

No law sets a frequency, and HSE's guidance does not give one. The test is whether what people were told is still true. Re-induct when:

  • The site changes significantly, such as moving from groundworks to frame, a new crane, a new access route or a new phase
  • The induction itself changes, for example after an incident or a change to the emergency plan
  • Someone returns after a long time away from the site
  • Your company procedures or the client's rules set a refresh period
  • Someone has clearly not understood or followed it

Put a version number on each induction. When the content changes, you can see straight away who was inducted on the old version and needs the new one.

Multilingual site inductions

On plenty of UK sites, a good share of the workforce does not have English as a first language. HSE's guidance says to consider special requirements, such as translating the site rules for workers who do not speak English. An induction that is suitable for one person can be meaningless to the next.

Things that help:

  • Plain language and short sentences
  • Photos of the site, and the real thing where you can
  • A colleague who shares the person's language
  • Written material in their own language
  • Checking understanding one to one, not across the group

Paper cannot do this part. In Crate, operatives can open the site induction on their own phone, translated into their own language, and read along as the supervisor delivers it.

What should a site induction record include?

If something goes wrong, the first questions are who was on site and what they had been told. A good record includes:

  • The worker's name, employer and trade
  • The site, the date and the time
  • The version of the induction they received
  • Who delivered it
  • The worker's own signature or confirmation that they understood it
  • Cards checked, such as CSCS
  • The language it was given in, where that was not English

An induction register filled in by the supervisor after everyone has gone to work proves only that the supervisor can spell.

No law sets a single retention period for site induction records. Your procedures and contracts usually will, so check them.

Common site induction mistakes

Most poor inductions fail in the same handful of ways.

  • The generic inductionIf it could be given on any site, it is not a site induction. It is a lecture.
  • Out-of-date contentThe site has moved on and the induction has not. People get told about a gate that was closed in March.
  • Inducting after work has startedThe person is already up the scaffold by the time anyone asks whether they have been inducted.
  • Forgetting visitors and driversThey walk past the same plant and the same excavations. Proportionate does not mean nothing.
  • English onlyAn induction someone could not follow is an induction they did not get.
  • Signing for the whole gangOne signature for six people is evidence that one person was there.

Paper or digital site inductions?

Paper induction registers live in a cabin drawer, get wet, and cannot be found when the client asks who was inducted in May. Re-inductions are tracked in someone's head.

In Crate, admins and managers build site induction templates for each site, with version numbers, using PDFs, videos, slides and text. Supervisors run the induction on site, register who attended and capture signatures. Operatives acknowledge the site rules and confirm they understood, then sign by QR code, either on the supervisor's screen or on their own phone in the Crate app, so there is less queuing at the cabin door. Signed inductions show in each operative's passport.

Records export by site, worker or date, as CSV or PDF, along with an Induction Attendance Report, and Crate shows which re-inductions are due. Each record is digital, dated, signed and kept against the site, which supports your Building Safety Act evidence, and the golden thread on higher-risk buildings.

See how site inductions work in Crate, from template to signed record.Site inductions in Crate

Sources

  1. Construction (Design and Management) Regulations 2015, regulation 13, legislation.gov.uk
  2. Construction (Design and Management) Regulations 2015, regulation 15, legislation.gov.uk
  3. Site rules and induction, HSE
  4. CDM 2015: contractors, roles and responsibilities, HSE

Site induction questions

The questions site teams ask us most, answered straight.

What is a site induction?

A site induction is a briefing given to everyone before they first work on a construction site, covering that site's rules, risks, emergency arrangements and welfare.

Is a site induction a legal requirement?

Yes. Regulation 13(4) of CDM 2015 requires the principal contractor to ensure a suitable site induction is provided, and regulation 15 requires contractors to provide one to their own workers where the principal contractor has not.

Who is responsible for site inductions?

The principal contractor, on projects with more than one contractor. On a project with only one contractor, that contractor provides it to the workers under their control.

What should a site induction cover?

The project and who is in charge, site rules, the particular risks on the site and how they are controlled, traffic routes, emergency arrangements, first aid, accident reporting, welfare, and how workers will be briefed and consulted.

How long should a site induction take?

No law sets a length. It should be long enough to cover the risks on that site properly and check people understood, and short enough that they are still listening at the end.

Do visitors need a site induction?

Yes, in proportion to the visit. HSE says escorted visitors only need to know the main hazards and control measures, while unescorted visitors need more.

How often should site inductions be repeated?

No law sets a frequency. Re-induct when the site or the induction changes significantly, when someone returns after a long absence, or when your procedures require it.

Can a site induction be given in another language?

Yes, and often it should be. HSE suggests translating site rules for workers who do not speak English, and an induction only works if the person understood it.