People and site compliance

Point of work briefing software for construction

A point of work briefing in Crate happens where the work happens: at the work area, right before the task starts. Supervisors issue the briefing to their team on site, the team signs to confirm they were briefed, and each briefing is kept against the site and date.

  • Given at the work area
  • Based on the task's RAMS
  • Signed by the team
Groundworker in a white safety helmet and orange hi-vis holding up his phone, beside a Crate screen asking him to confirm the time work began
At the work area

Briefed where the task happens, not in the site office.

Right before the task

The team hears the controls minutes before they start.

Signed by the team

Each operative signs to confirm they were briefed.

Dated and on record

Kept against the site and date, with the confirmed start time.

How a point of work briefing works in Crate: one task, start to finish

Follow one steel fixing team from their start time to the moment work begins.

  1. 09:00

    The start time is confirmed

    Aleksander Nowak arrives at the level 2 deck and confirms his start time on his phone, 09:00, adjusting it if he needs to.

    Start confirmed09:00
  2. 09:05

    The briefing is issued at the work area

    Stuart Hill issues a point of work briefing to the team on Riverside, standing beside the reinforcement they are about to fix. He talks them through the task and the controls in its RAMS.

    Briefing issuedFix reinforcement, level 2 slab
  3. 09:10

    The team signs

    Each operative signs to confirm they were briefed, and Crate records who signed and when.

    Team signed3 of 3 signed
  4. 09:15

    The task begins, with a record behind it

    The team starts fixing the reinforcement ahead of the slab pour. The briefing is kept against Riverside Quarter and today's date, so if anyone asks later how the task was briefed, the record shows who was there and when.

    RecordedRiverside Quarter, 16/10/2026

What is a point of work briefing?

A point of work briefing is a short briefing given at the work area, right before a task starts. The supervisor talks the team through the task in front of them, its hazards and the controls in its RAMS, so the people doing the work hear it where and when it matters.

Done on paper, it often happens in the site office or gets rushed. Sheets are signed later or lost, the RAMS stays in a folder in the cabin, and there is no reliable record of who was briefed on which task.

With Crate, supervisors issue the briefing to their team on site at the work area, the team signs to confirm they were briefed, and each briefing is kept against the site and date.

What a point of work briefing covers

  • The task about to start, and where
  • The hazards at that work area
  • The controls set out in the task's RAMS
  • Anything that has changed since the RAMS was written
  • Who is doing the work
  • What to do if conditions change

Crate keeps each briefing against the site and date, with who signed and when.

Every point of work briefing, from the work area to the site record

Supervisors issue briefings from a phone or tablet. Site managers see every briefing on the site. Each one leaves a dated, signed record.

Every briefing on the site, by date

See each briefing on the site with the task, the work area, who issued it, when, and how many of the team signed. Open one to see the RAMS it relates to, the confirmed start time and who signed.

Issued to the team in a couple of taps

At the work area, the supervisor issues the briefing to their team on site, with the task, the work area and the RAMS it relates to. The team signs to confirm they were briefed.

  • Issued at the work area, not the office
  • The task's RAMS to hand
  • A signature from each operative

A dated record of how each task was briefed

Each briefing is kept against the site and date, with the task, the RAMS it relates to, who gave it, the confirmed start time and who signed. It is the kind of record principal contractors draw on for their Building Safety Act evidence.

  • Site, date and work area on every record
  • The confirmed start time
  • Who briefed the team and who signed

Sign a point of work briefing by QR code

At the work area there is no cabin and no clipboard. Crate gives the team two ways to sign each point of work briefing, and both keep the same record.

Supervisor app

Scan their passport, sign on one screen

The supervisor scans each operative's passport QR code in the supervisor app, then everyone signs on the supervisor's screen. No sign-in sheet and no typing names.

Their own phone

Scan the QR code, sign on their own phone

Operatives scan the QR code with their own phone and sign the point of work briefing from their passport in the Crate app, all at the same time.

Less queuing

Scan and sign on one screen, or let the whole team sign at once on their own phones.

The same record, either way

Both routes save the signed point of work briefing, with each person's name and the time they signed.

On their own phone, in their passport

Every signed point of work briefing shows in the operative's passport, so they can view the record on their own phone at any time.

Point of work briefings in their own language

Not everyone on site has English as a first language. Operatives can open the point of work briefing on their own phone, translated into their own language, and read along as the supervisor delivers it.

Afterwards, the signed record stays in their passport, so they can look back at what was covered at any time.

  • Translated into the operative's own language
  • Read along on their own phone as it is delivered
  • The signed record on their own phone afterwards

Information where the work happens, and a record that lasts

Under CDM 2015, contractors must give every worker under their control appropriate supervision, instructions and information so the work can be carried out safely, including information on the risks identified by the risk assessment. A point of work briefing puts that information in front of the team at the work area, just before they start.

The Building Safety Act raises the bar on records. On higher-risk buildings, at least 18 metres or 7 storeys with at least 2 residential units, or hospitals and care homes, principal contractors must use the client's record-keeping system to keep the building's golden thread information up to date. A dated, named record of how each task was briefed supports that information and your wider Building Safety Act evidence.

Crate keeps the records. Deciding what each task needs, and meeting your duties, stays with your team. Take advice on what your projects need.

"A contractor must provide each worker under their control with appropriate supervision, instructions and information so that construction work can be carried out, so far as is reasonably practicable, without risks to health and safety."

Construction (Design and Management) Regulations 2015, regulation 15(8)
CDM 2015Regulation 15(9) adds information on the risks identified by the risk assessment
Golden threadUp-to-date digital information for higher-risk buildings

Last updated October 2026

Point of work briefing versus toolbox talk versus daily activity briefing

Three briefings, three jobs. Most sites use all of them.

QuestionPoint of work briefingToolbox talkDaily activity briefing
What it isA short briefing on one task, its hazards and its controlsA short talk on one health and safety topicA briefing on the day's activities, hazards and controls
When it happensRight before the task startsWhen it suits the work, often at the start of a shiftAt the start of the working day or shift
Where it happensAt the work areaOn site, often at the cabin or a briefing areaOn site, usually at a briefing area
Who gives itThe supervisor of the team doing the taskA supervisor, foreman or site managerThe site manager or a supervisor
Who attendsThe team about to do the taskThe teams the topic applies toEveryone working on the site or area that day
What it is based onThe task's RAMS and the conditions at the work areaA set topic, often from a templateThe day's programme, tasks and RAMS
How often, in generalBefore the task, and again if it or the conditions changeRegularly, and when new risks come upEvery working day

These are general descriptions. Contractors use the terms in slightly different ways, so follow your own procedures.

Paper sheets versus point of work briefings in Crate

The same briefing, given where it counts, with a record you can find again.

QuestionPaper briefing sheetsPoint of work briefings in Crate
Where it happensOften in the site office, away from the taskAt the work area, right before the task
The RAMSIn a folder in the cabinEach briefing relates to the task's RAMS
SignaturesCollected later, if at allThe team signs to confirm they were briefed
Start timeWritten down from memoryOperatives confirm when work began
Finding a recordSomewhere in a box fileKept against the site and date
Showing how a task was briefedHard to prove months laterA dated record of who was briefed and when
Site supervisor with a tablet giving a point of work briefing to three operatives beside steel reinforcement at the work area, with the Crate option to issue a point of work briefing

Brief the team where the work is

A point of work briefing works best beside the task: the reinforcement, the excavation, the scaffold. Supervisors issue the briefing to their team on site from a tablet, talk them through it, and the team signs there and then. Each briefing is kept against the site and date.

  • Issued to the team on that site
  • Signed at the work area
  • Kept against the site and date

Questions about point of work briefings

Straight answers to what construction teams ask us most.

What is a point of work briefing?

A point of work briefing is a short briefing given at the work area, right before a task starts, covering the task, its hazards and the controls in its RAMS. In Crate, supervisors issue the briefing to their team on site and the team signs to confirm they were briefed.

What does POWB stand for?

POWB stands for point of work briefing. Point of work means the place where the task is about to happen, which is where the briefing is given.

What is the difference between a point of work briefing and a toolbox talk?

A point of work briefing covers one task, at the work area, right before it starts. A toolbox talk covers one health and safety topic, such as ladder safety or silica dust, and is not tied to a single task. Crate records each as its own briefing type.

How does a point of work briefing relate to RAMS?

The RAMS sets out how a task will be done safely. The point of work briefing takes the relevant parts of it to the team at the work area, so the people doing the job hear the hazards and controls just before they start. In Crate, each point of work briefing relates to the task's RAMS.

Who should give a point of work briefing?

Usually the supervisor or foreman in charge of the team doing the work, because they know the task and the work area. In Crate, supervisors issue the briefing to their team on site from a phone or tablet.

Is a point of work briefing a legal requirement?

The law does not name point of work briefings. CDM 2015 requires contractors to give every worker under their control appropriate supervision, instructions and information, including information on the risks identified by the risk assessment. A point of work briefing is a practical way to help meet that duty at the moment it matters. Take advice on what your projects need.

How do point of work briefings support the Building Safety Act?

On higher-risk buildings, those at least 18 metres or 7 storeys with at least 2 residential units, or hospitals and care homes, principal contractors must use the client's record-keeping system to keep the building's golden thread information up to date. Crate keeps a dated, signed record of how each task was briefed against the site, which supports that information and your wider Building Safety Act evidence. Take advice on how the duties apply to your projects.

Can operatives record when work actually started?

Yes. Operatives confirm their start time on their phone, adjusting it if needed, so the record shows when work actually began.

How do operatives sign a point of work briefing?

Two ways. The supervisor can scan each operative's passport QR code and everyone signs on the supervisor's screen, or operatives scan the QR code with their own phone and sign in the Crate app. Each signed point of work briefing shows in the operative's passport.

Can operatives read a point of work briefing in their own language?

Yes. Operatives can open the point of work briefing on their own phone, translated into their own language, and read along as it is delivered. The signed record then stays in their passport.

Brief the task where it happens.

Book a demo and we'll show you how a point of work briefing runs in Crate, from the start time to the signed record, using your own sites and RAMS.

Book a demo