Quality permits for construction hold points
Crate turns your quality hold points into digital quality permits. An engineer or supervisor raises the permit and sends it for approval. Once the work has been inspected, it is approved and sent to the operative assigned to the task, and Crate records who raised it, who approved it and when.
- Raised and approved on site
- Sent to the assigned operative
- Who and when, on every permit

Each quality hold point becomes a permit raised on site.
The engineer or supervisor sends it to be checked.
Once the work is inspected, it is approved and sent to the operative.
Every permit shows who raised it, who approved it and when.
How quality permits work in Crate: one concrete pour
Follow one permit from the supervisor's tablet to the moment the concrete goes in.
- Raised by Stuart Hill07:30
- Sent for approval09:50
- Approved by Daniel Hughes10:20
- Sent to Andrei Popescu10:22
-
07:30
A permit for the pour
Kestrel Rebar are finishing the steel for the level 2 slab, bay 4. Supervisor Stuart Hill raises a quality permit for the pour on his tablet.
RaisedRaised by Stuart Hill -
09:50
Sent for approval
Once the last bars are tied, Stuart sends the permit to site manager Daniel Hughes for approval. Until it is approved, the pour waits.
Awaiting approvalWith Daniel Hughes -
10:20
Inspected and approved
Daniel checks the bar sizes, spacing and cover in the formwork against the drawings, then approves the permit. Crate records who approved it and when.
ApprovedApproved by Daniel Hughes -
13:00
Sent to the operative, and the pour goes ahead
The approved permit goes to Andrei Popescu, the operative assigned to the pour. The concrete goes in at 13:00, with a dated record that the steel was checked first.
Sent to operativeAndrei Popescu, Brightline Groundworks
What are quality permits?
Quality permits are the sign-off for a quality hold point: a stage where the next activity cannot start until someone has inspected what has been built, such as the steel before a concrete pour. They are one of the simplest construction quality control tools there is.
On many sites the hold point is a paper sign-off sheet in a folder in the cabin. Sheets get missed, signed after the event or lost, and once the concrete is in or the ceiling is boarded, there is no going back to check.
In Crate, the engineer or supervisor raises the quality permit and sends it for approval. Once the work has been inspected, it is approved and sent to the operative assigned to the task, and every permit records who raised it, who approved it and when.
What every quality permit records
- The work, its location and the task it covers
- Who raised it, and when
- When it was sent for approval
- Who approved it, and when
- The operative it was sent to
- A record kept against the site
You decide where your hold points sit. Crate keeps the dated record of each one.
Quality permits in the office, on site and on paper
Managers see every permit and where it is up to. Approvers sign off where the work is. Every permit leaves a record you can download.
Every permit and where it is up to
See every quality permit on the site with where the work is, who raised it and whether it is approved or awaiting approval. Open any permit to see who approved it, when, and the operative it was sent to. Permits to work sit on the next tab.
Approved at the work face
The approver opens the permit on site, inspects the work and approves it there and then. The approved permit is sent to the operative assigned to the task, without anyone walking back to the cabin.
- Who raised it and when, on one screen
- Each sign-off step, ticked off as it happens
- Sent to the assigned operative once approved
A dated record for every hold point
Each quality permit produces a record showing the work, where it is, who raised it, who approved it and the operative it was sent to, each step with its date and time.
- Raised, approved and sent, each with a date and time
- Names and roles at every step
- Ready to download as a PDF
Sign quality permits by QR code
Everyone who needs to sign a quality permit can do it without a trip back to the cabin. Crate gives your team two ways to sign, and both keep the same record.
Scan their passport, sign on one screen
The supervisor scans each operative's passport QR code in the supervisor app, then everyone signs on the supervisor's screen. No sign-in sheet and no typing names.
Scan the QR code, sign on their own phone
Operatives scan the QR code with their own phone and sign the quality permit from their passport in the Crate app, all at the same time.
Scan and sign on one screen, or let the whole team sign at once on their own phones.
Both routes save the signed quality permit, with each person's name and the time they signed.
Every signed quality permit shows in the operative's passport, so they can view the record on their own phone at any time.
Evidence the work was checked before it was covered up
Under the Building Safety Act, the golden thread is the digital information kept about a higher-risk building: one at least 18 metres or 7 storeys high with at least 2 residential units, or a hospital or care home. Government guidance says the principal contractor must keep evidence that the building work meets building regulations.
Once concrete is poured or a ceiling is boarded, the work underneath cannot be seen. Quality permits with the names, dates and times of who raised and approved them show it was checked first. Crate keeps those records against each site, supporting your golden thread information and Building Safety Act evidence.
Crate is not a golden thread system and does not make anyone compliant. It keeps dated, named records that support your evidence. Take advice on what your projects need.
"You must… keep evidence that the building work meets building regulations"
Keeping information about a higher-risk building: the golden thread, gov.uk guidance on the principal contractor's responsibilities
Last updated October 2026
Common construction hold points
Where most construction quality control plans put a hold point, and why it matters.
| Hold point | Why it matters |
|---|---|
| Before a concrete pour | Reinforcement, cover, fixings and cast-in items cannot be seen once the concrete is in. Getting them wrong can mean breaking out the slab. |
| Before backfilling | Drainage, ducts, membranes and foundations are checked for line, level and damage before they are buried. |
| Before covering up services | Pipework and cables are checked and tested before they disappear under screed or behind insulation and boarding. |
| Before closing up walls or ceilings | Fire stopping, cavity barriers, insulation and fixings are checked while they can still be seen. Faults found later mean opening up finished work. |
| Before loading new structure | Strength, connections and temporary works are confirmed before new structure takes load, such as striking props under a slab. |
| Before handover of an area | Finishes, defects and test results are checked before an area passes to the next trade or the client, so problems are not handed on. |
General guidance only. Your specification and inspection and test plans set the hold points for each job, and who must inspect them.
Paper sign-off sheets versus quality permits in Crate
The same hold points, with a record that does not get lost in the cabin.
| Question | Paper sign-off sheets | Quality permits in Crate |
|---|---|---|
| Raising the hold point | A sheet filled in by hand, if there is one to hand | Raised on site and sent for approval |
| Getting it approved | Chasing someone round site for a signature | Sent to the approver to inspect and approve |
| Telling the operative | A word on site or a phone call | The approved permit is sent to the assigned operative |
| Who and when | Initials and a date, sometimes added afterwards | Who raised it, who approved it and when |
| Finding it later | A folder in the cabin, until it goes missing | Kept against the site, ready to download |
| Building Safety Act evidence | Hard to piece together once the work is covered | Dated, named records that support your evidence |

Checked before it is covered up
Before a pour, the steel in the formwork is inspected with the permit open on a tablet. Once the work has been checked, the quality permit is approved and sent to the operative assigned to the task, so everyone knows the hold point has been cleared.
- Inspected and approved where the work is
- Sent to the operative assigned to the task
- Who approved it and when, kept with the permit
Questions about quality permits
Straight answers to what construction teams ask us most.
What is a quality permit?
A quality permit is the sign-off for a quality hold point, a stage where work stops until it has been inspected. In Crate, an engineer or supervisor raises the permit and sends it for approval. Once the work has been inspected, it is approved and sent to the operative assigned to the task.
What is a hold point in construction?
A hold point is a stage in the work that cannot be passed until a named person has inspected and accepted what has been done, such as checking reinforcement before a concrete pour. Hold points are usually set out in the specification or an inspection and test plan.
What is the difference between a quality permit and a permit to work?
A permit to work controls high-risk activities, such as hot works, to keep people safe. A quality permit controls a quality hold point, to make sure work is right before the next stage covers it up. Crate keeps both under Permits.
What does each quality permit record?
Every quality permit records who raised it, who approved it and when, and the operative it was sent to. That gives you a dated record that each hold point was checked before work moved on.
Do quality permits replace inspection and test plans?
No. Your inspection and test plans and specification set out what needs checking and where the hold points are. Quality permits in Crate record that each hold point was raised, approved after inspection and sent to the operative.
How do quality permits support the Building Safety Act and golden thread?
For higher-risk buildings, government guidance says the principal contractor must keep evidence that the building work meets building regulations. Dated quality permits showing work was checked before it was covered up support that evidence and your golden thread information. Crate does not make anyone compliant, so take advice on what your projects need.
Are quality permits only for higher-risk buildings?
No. Hold points are part of construction quality control on every job. The golden thread applies to higher-risk buildings, but the Building Regulations dutyholder duties apply to all building work in England.
Can site teams use quality permits on a tablet?
Yes. Engineers and supervisors can raise quality permits on a tablet on site, and approvers can approve them where the work is, without going back to the cabin.
How do operatives sign a quality permit?
Two ways. A supervisor can scan each operative's passport QR code and they sign on the supervisor's screen, or operatives scan the QR code with their own phone and sign in the Crate app. Each signed quality permit shows in the operative's passport.
Works with the rest of Crate
Quality permits sit alongside the rest of your site records in Crate.
Permits to work
Issue, approve and accept permits for high-risk work.
Site issue register
Log quality issues from a phone and track them to completed.
Site diaries
A dated record of what happened on site each day.
RAMS
Brief your method statements and record who has signed them.
Checked, approved and on record before the pour.
Book a demo and we'll show you how quality permits run in Crate, from raising the permit to sending it to the operative, using your own hold points.