Site compliance software for construction
Crate is site compliance software for UK construction that keeps every operative, induction, briefing, permit and signature in one place. The office, supervisors and operatives each get their own digital pathway, and every record lands against the right person and the right site.
- Used on some of London's largest projects
- Works offline on site
- Direct, agency and subcontract workers

A web app for the office, a supervisor app for site and a passport for every operative.
Pre-enrolment, business and site inductions recorded before anyone starts.
Briefings, RAMS and permits signed by QR code, on site or on their own phone.
Live dashboards, an audit trail and PDF reports by site and period.
What is site compliance software?
Site compliance software keeps the records that show the people on your sites are inducted, briefed, competent and working under the right controls. Inductions, RAMS, daily briefings, permits, training cards and attendance, held digitally against each person and each site.
On plenty of sites that still means clipboards, signing sheets and a cabin full of lever arch files. Sheets go missing, signatures get chased round site on a Friday, and nobody can say who is on site right now without walking the floor.
Crate is construction compliance software built around the people who do the work. The office, the supervisor and the operative each have their own way in, so the record is made where the work happens, at the time it happens.
What Crate keeps for every site
- Who is enrolled, inducted and on site now
- Every briefing, RAMS and permit, with signatures
- Cards, training and expiry dates
- Diaries, site tours and issues through to close-out
- Photos and evidence on the record
- An audit trail behind every record
You decide how long records are kept. Crate keeps them in order and easy to find.
Three digital pathways, one record
Site compliance software only works if the people on site actually use it. Crate gives the office, supervisors and operatives each their own pathway, and all three write to the same record for every person and every site.
The web app: every site from the office
Set up your sites, templates and RAMS once, then watch it all happen live. Who is on site, what is signed, what is overdue, across every project you run.
Who uses it: HR, compliance, HSEQ and senior managers.
- Invite workers and track pre-enrolment
- Live compliance dashboards and attendance
- Actions and issues followed to close-out
- PDF reports and data exports per site and period
The supervisor app: run the day on site
Inductions, briefings, permits, issues and the site diary, all from a phone or tablet on the floor. No signal in the basement? It keeps working and syncs later.
Who uses it: Site managers, supervisors and foremen.
- Scan passports and collect signatures
- Issue and close out permits with photos
- Works offline, syncs when back in signal
The passport: every operative, one record
Each operative gets a passport with a unique ID and QR code. It holds their cards, training and every record they have signed, in their preferred language.
Who uses it: Employees, agency workers and subcontractors.
- Pre-enrolment and inductions before day one
- Sign briefings and permits on their own phone
- Signed records always to hand
Whichever pathway someone uses, the record lands against the same person and the same site.
Capture records offline on site. They sync as soon as the device is back in signal.
Operatives cannot edit compliance records once submitted. Only authorised admins can, with soft delete and an audit trail.
How site compliance software works in Crate: one operative, one week
Follow one electrician through Crate's site compliance software, from his invite to the Friday report, across all three pathways.
- Pre-enrolment and business inductionThu 19:05
- Site induction, Riverside QuarterMon 07:12
- Daily activity briefing07:34
- Permit PTW-0143 accepted07:56
- Attendance, in and out06:58 to 15:45
- Weekly site reportFri 16:00
-
Thursday
Enrol: ready before day one
Volt Electrical adds Jake through Crate's self-service portal. That evening he completes pre-enrolment and the business induction on his phone, and his passport arrives with a unique QR code.
EnrolledPassport issued -
Monday, 07:00
Induct: onto Riverside Quarter
Mark Davies runs the site induction at the cabin. Jake follows it on his own phone and signs by scanning the QR code. No queue for one clipboard.
InductedSite induction signed 07:12 -
07:30
Brief and sign: the day ahead
The daily activity briefing covers today's tasks, hazards and controls. Jake reads along and signs, and Mark can see who has signed and who has not.
BriefedDAB signed 07:34 -
07:56
Permit and control: before work starts
Jake accepts the electrical isolation permit for the plant room. When the job is done, the permit is closed out with a photo of the workspace on the record.
Permit acceptedPTW-0143 accepted 07:56 -
15:45
Prove attendance: in and out
All day, live attendance shows Jake on site. QR attendance with two-scan confirmation records when he arrived and when he left, so nobody is guessing at a headcount.
Signed outIn 06:58, out 15:45 -
Friday
Report and hand over: the week on file
Daniel Hughes downloads a versioned PDF report for Riverside Quarter for the week. Inductions, briefings, permits and attendance, with every signature, ready for the client.
On recordWeekly report ready
Every feature in Crate's site compliance software
Three areas, one platform. Every feature shares the same people, sites and records, so nothing gets typed in twice.
Onboarding and workforce
Get people ready before they arrive, and keep their records in date.
6 featuresSite safety and briefings
Brief every task and get it signed, in the languages your site speaks.
6 featuresSite control and records
Control high-risk work and keep a record of every day on site.
8 featuresEvery sign-off, signed two ways
With Crate's site compliance software, site inductions, DABs, toolbox talks, RAMS, point of work briefings and permits can all be signed two ways. Pick whichever suits the moment. Both keep the same record.
Scan their passport, sign on one screen
The supervisor scans each operative's passport QR code in the supervisor app, then everyone signs on the supervisor's screen. No sign-in sheet and no typing names.
Scan the QR code, sign on their own phone
Operatives scan the QR code with their own phone and sign the briefing from their passport in the Crate app, all at the same time.
Scan and sign on one screen, or let the whole team sign at once on their own phones.
Both routes save the same signed record, with each person's name and the time they signed.
Every signed record shows in the operative's passport, so they can look back at it on their own phone at any time.
Briefings and inductions in their own language
Plenty of sites run in four or five languages. Briefings and inductions open on the operative's own phone, translated into their preferred language, with an interactive read-along as the supervisor delivers.
The passport itself is in their preferred language too, so the person signing understands what they are signing.
- Translated into each operative's preferred language
- Interactive read-along on their own phone
- The signed record in their passport afterwards
Records that support your legal duties
No site compliance software makes a business compliant, and Crate is no exception. Competent people, planning and supervision do that. What Crate gives you is dated, signed records against each person and each site, ready when a client, auditor or inspector asks.
Building Safety Act 2022 and the golden thread
"…you must use the record-keeping system provided by the client to ensure that information about the building is up to date."
gov.uk, Keeping information about a higher-risk building: the golden thread (guidance for principal contractors)
The golden thread applies to higher-risk buildings: at least 18 metres or 7 storeys with at least 2 residential units, or hospitals and care homes. Dutyholder and competence duties apply to all building work. Crate's dated, signed records of permits, RAMS, quality permits and site diaries support your Building Safety Act evidence and golden thread information. What is the golden thread?
CDM 2015
"The principal contractor must plan, manage and monitor the construction phase…"
Construction (Design and Management) Regulations 2015, regulation 13(1)
Regulation 13(4) also requires a suitable site induction. Site inductions, briefings, site tours and diaries in Crate give principal contractors a dated record of how the construction phase was managed and monitored.
Health and Safety at Work etc. Act 1974
"…the provision of such information, instruction, training and supervision as is necessary to ensure, so far as is reasonably practicable, the health and safety at work of his employees"
Health and Safety at Work etc. Act 1974, section 2(2)(c)
Inductions, briefings, toolbox talks and training records show what information, instruction and training each person received, and when.
UK GDPR
"…kept in a form which permits identification of data subjects for no longer than is necessary for the purposes for which the personal data are processed"
UK GDPR, Article 5(1)(e)
Your business is the data controller and decides how long workforce records are kept. Only authorised admins can edit submitted compliance records, and every record has an audit trail behind it.
Information management
Version control in line with information management good practice, such as ISO 19650. RAMS are versioned and PDF reports are saved as versioned snapshots, so you can show what was issued, who signed it and when.
This is general guidance, not legal advice. Take advice on how the duties apply to your business and your projects.
Last updated October 2026
Built for the whole business, not just the safety team
Site compliance software for the board and the gate. Subcontractor compliance, site control and a clear view across every site, all from the same records.
Business owners and directors
Know every site is run properly without chasing paper. See compliance across all your sites, with the records ready when a client asks.
Senior management
Compare sites side by side: who is on site, what has been signed and what is still open.
Site management
Run the site from the cabin or the floor. Inductions, permits, diaries and issues, with a live view of who is on site.
HSEQ and compliance
Control RAMS versions, keep an eye on card expiry, run site tours and pull reports and exports when an audit comes round.
Supervisors
Brief the gang, scan passports and get everyone signed, even with no signal. No clipboard, no chasing signatures on a Friday.
Operatives and subcontractors
One passport for every site, in their own language. Agencies and subcontractors manage their own people through the self-service portal.
Site compliance guides
Before you choose site compliance software, it helps to know what good looks like. Plain-English guides for the people who run sites, grouped by topic.
Onboarding and workforce
Right to work checks in constructionWhat is a business induction?What to put in a construction onboarding packConstruction training recordsConstruction time and attendanceInductions and briefings
What is a site induction?What is a toolbox talk?What is a daily activity briefing?What is RAMS?What is a point of work briefing?Get the free daily activity briefing template
A ready-to-use DAB template for your sites, free. Add your details in the form below to get it.
Questions about site compliance software
Straight answers to what construction teams ask us most.
What is site compliance software?
Site compliance software keeps the records that show the people on your sites are inducted, briefed, competent and working under the right controls. It is sometimes called construction compliance software or health and safety software for construction. Crate holds inductions, RAMS, briefings, permits, training and attendance in one platform, against each person and each site.
What devices does Crate work on?
Crate's site compliance software has three digital pathways: the web app for the office, the supervisor app for site teams and the passport app on each operative's own phone. Office teams use the web app on a computer, and supervisors and operatives use phones or tablets on site.
Does Crate work without signal?
Yes. Records can be captured offline and sync when the device is back in signal, so a basement or a remote site does not stop a briefing, an induction or an inspection.
How do agency workers and subcontractors fit in?
They get the same pre-enrolment, inductions and passport as direct employees. Agencies and subcontractors manage their own people through a self-service portal, so subcontractor compliance sits in the same system and your team is not typing in other companies' details.
Can I see who is on site right now?
Yes. QR attendance with two-scan confirmation feeds a live attendance view of who is on each site. Live compliance dashboards show what has been signed and what is still outstanding.
Does Crate work for operatives who do not speak English?
Yes. Each operative's passport is in their preferred language. Briefings and inductions open on their own phone translated into that language, with an interactive read-along as the supervisor delivers.
How does Crate track competency and card expiry?
Cards, training and certificates sit on each operative's passport with their expiry dates, shown as valid, expiring or expired, so gaps show up before someone reaches the gate. Crate holds the records for your own checks.
How are RAMS versions controlled?
RAMS are held as controlled documents. Once the first person signs, that version is frozen and any change becomes a new version, so every signature stays tied to the version that person was briefed on.
How are permits to work handled in Crate?
Permits are issued, accepted and closed out in Crate, with the name and time at each step. Photos and evidence can be attached, including a photo of the workspace at close-out, and the closed permit keeps a dated record against the site.
How long does Crate keep records?
You decide. Your business is the data controller and sets how long records are kept. Crate uses soft delete and keeps an audit trail, and operatives cannot edit compliance records once submitted. Only authorised admins can.
Can we get our data out, and does Crate integrate with other systems?
Yes. Crate produces versioned PDF report snapshots for each workflow, site and period, plus structured data exports. It connects to existing time and attendance systems through its API, and the Go2Clock integration is live.
How do we get started?
Start with a demo. We'll look at your sites, your workforce and the paperwork you use now, and show you how Crate's site compliance software would be set up around them.
More from Crate
Site compliance software is one part of Crate. The same platform covers plant, vehicles and waste.
Plant and assets
Inspections for any asset type, with QR codes, NFC tags and defects closed out properly.
Vehicles
Daily walkaround checks, defects, servicing and a fleet register with an audit trail.
Wasteify
Scheduling, a driver app and digital waste transfer notes for UK waste carriers.
Every person, every site, on record.
Book a demo and we'll show you Crate's site compliance software and its three pathways, from the office to the supervisor to the operative's own phone, set up around your own sites.