Site issue register software for construction
Crate's site issue register gives every site one place to log, track and close out issues. Anyone on site can log an issue from their phone and gets a reference to follow it up, and each one carries a category, priority and due date until it is completed.
- Logged on site from a phone
- A reference for every issue
- Full history, logged to completed

Anyone on site logs an issue from their phone and gets a reference.
Every issue says what kind it is, how urgent it is and when it is due.
Site teams see the open issues on their own site.
Managers see what is outstanding across all sites.
How a site issue register works in Crate: one rebar issue
Follow one quality issue from the moment it is spotted to the day it is closed out.
- CategoryQuality
- SiteRiverside Quarter
- PriorityHigh
- Due date15/10/2026
- Logged by Mark DaviesMon 09:10
- Priority and due date setMon 09:40
- Completed by Mark DaviesWed 11:15
-
09:10
Spotted and logged from a phone
Supervisor Mark Davies spots rebar out of position on a column in block A. He logs it on his phone as a quality issue and gets reference SI-123-456 to follow it up.
OpenReference SI-123-456 -
09:40
Given a priority and a due date
Site manager Daniel Hughes sets it to high priority, due on Thursday, before the column is poured. The site team can see it with the other open issues on Riverside Quarter.
High priorityDue 15/10/2026 -
Tuesday
Put right on site
Aleksander Nowak from Kestrel Rebar refixes the bars to the drawing. The issue stays open until the work has been checked.
OpenDue in 2 days -
Wednesday
Completed, with the history kept
Mark checks the column and marks the issue completed, a day before it was due. The register keeps the full history, from when it was logged to when it was completed.
CompletedCompleted 14/10/2026
What is a site issue register?
A site issue register is the list of everything on site that needs putting right, from quality defects to damage. Each issue is recorded with what it is, how urgent it is and when it must be fixed by, and it stays on the register until it is closed.
On most sites, issues are reported in WhatsApp groups, emails, texts and a spreadsheet someone updates when they get a minute. Messages get buried, nobody is sure what is still open, and when someone asks how a defect was dealt with, the answer is spread across a dozen threads.
Crate's site issue register puts every issue in one place. Anyone on site logs it from their phone and gets a reference, it is given a category, priority and due date, and it stays open until it is completed, with the full history kept.
What every issue in Crate carries
- A reference to follow it up
- A category, such as quality
- The site it belongs to
- A priority and a due date
- An open or completed status
- The full history, from logged to completed
Site teams see the open issues on their own site. Managers see every site.
One site issue register, from the phone to the office
Anyone on site can log an issue. Site teams work through what is open. Managers see what is outstanding across every site.
Every issue, open or completed
See every issue with its category, priority, due date and status, and switch between open and completed. Open any issue to see who logged it, when, and what has happened since.
Logged on the spot, with a reference
Whoever spots the problem logs it from their phone there and then, and gets a reference to follow it up. No waiting until they are back in the cabin, and no message lost in a group chat.
- Logged on site from a phone
- A reference for every issue
- Open issues on their own site to work through
The full history of every issue
Each issue produces a record with its category, site, priority, due date and status, and every step from when it was logged to when it was completed.
- Every step with its date and time
- Who logged it and who completed it
- Ready to download as a PDF
A dated record of what was found and how it was fixed
In England, Part 2A of the Building Regulations 2010, brought in under the Building Safety Act, requires principal contractors to plan, manage and monitor building work so it complies. On higher-risk buildings, government golden thread guidance adds that the principal contractor must keep evidence that the building work meets building regulations.
A site issue register is part of how you show that monitoring happened. Crate keeps a dated record of every quality issue against its site, from the day it was logged to the day it was completed, supporting your golden thread information and Building Safety Act evidence.
Crate is not a golden thread system and does not make anyone compliant. It keeps dated, named records that support your evidence. Take advice on what your projects need.
"The principal contractor must… plan, manage and monitor the building work during the construction phase, and… coordinate matters relating to the building work comprised in the project to ensure the building work is in compliance with all relevant requirements."
Building Regulations 2010, regulation 11N(1)
Last updated October 2026
What to record for every site issue
The details that make an issue easy to fix, easy to follow up and easy to prove was dealt with.
| Detail | Why it matters |
|---|---|
| What and where | A clear description and an exact location, such as the level, gridline or room, so whoever fixes it does not have to go looking. |
| Category | Grouping issues, such as quality, safety or environmental, shows where problems keep coming from. |
| Priority | Puts the most serious issues first, such as anything that is about to be covered up or poses a risk to people. |
| Who owns it | One named person or company responsible for putting it right, so it does not fall between trades. |
| Due date | Sets when it must be fixed by, ideally before the next stage of work hides it. |
| Evidence of the fix | A note or photo showing the work was put right, so the fix can be checked later. |
| Date closed | Shows when the issue was resolved and how long it stayed open, which matters at audits and handover. |
General guidance for any issue register, paper or digital. Your contract, quality plan or client may ask for more.
WhatsApp, emails and spreadsheets versus a site issue register in Crate
The same issues, kept in one place everyone who needs them can see.
| Question | WhatsApp, emails and spreadsheets | Site issue register in Crate |
|---|---|---|
| Reporting an issue | A WhatsApp message, an email or a word in the cabin | Logged from a phone, with a reference |
| Knowing what is still open | Scrolling back through chats and threads | Every issue shows as open or completed |
| What comes first | Whoever shouts loudest | A priority and due date on every issue |
| Site teams | Updates lost in a busy group chat | See the open issues on their own site |
| Managers | A spreadsheet updated when someone has time | See what is outstanding across all sites |
| The record | Spread across phones and inboxes | Full history from logged to completed |

Know what needs fixing first
Each issue carries a category, such as quality, a site, a priority and a due date. Site teams can see every open issue on their site and work through the highest priority first, while managers keep track of what is outstanding across all sites.
- Category, site, priority and due date
- Open issues for each site team
- Every site in one view for managers
Closed out, with the record kept
Once the work is put right, the issue is marked completed. The site issue register keeps a clear record of what was found, when it was logged and when it was completed, so you can show how it was dealt with when someone asks.
- Marked completed when the work is put right
- Full history from logged to completed
- Dated records that support Building Safety Act evidence

Questions about the site issue register
Straight answers to what construction teams ask us most.
What is a site issue register?
A site issue register is a list of every issue on site that needs putting right, with what it is, how urgent it is, when it is due and whether it has been dealt with. In Crate, anyone on site can log an issue from their phone, and it stays on the register until it is completed.
Who can log an issue?
Anyone on site can log an issue in Crate from their phone. They get a reference as soon as it is logged, so they can follow it up.
What information does each issue have?
Each issue has a category, such as quality, the site it belongs to, a priority and a due date. Its status shows whether it is open or completed.
Can managers see issues across all sites?
Yes. Site teams see the open issues on their own site, and managers can keep track of what is outstanding across all sites.
What is the difference between a site issue register and a snagging list?
A snagging list usually covers defects found close to handover. A site issue register runs for the whole job and covers any issue that needs putting right, from quality defects to damage.
How does a site issue register support the Building Safety Act?
Principal contractors must plan, manage and monitor building work so it complies with all relevant requirements, and on higher-risk buildings they must keep evidence that the work meets building regulations. A dated record of quality issues and how they were resolved supports that evidence and your golden thread information. Take advice on what your projects need.
Can we stop reporting site issues on WhatsApp?
Yes. With every issue logged in Crate with a reference, a priority and a due date, there is one place to see what is still open, instead of messages spread across group chats.
What happens when an issue is fixed?
It is marked completed. The full history stays in the site issue register, from when the issue was logged to when it was completed.
Works with the rest of Crate
The site issue register sits alongside the rest of your site records in Crate.
Quality permits
Sign off hold points before work is covered up.
Site tours
Check the site against your questions and raise actions on the spot.
Site diaries
A dated record of what happened on site each day.
Permits to work
Issue, approve and accept permits for high-risk work.
Nothing lost between finding it and fixing it.
Book a demo and we'll show you the site issue register in Crate, from logging an issue on a phone to closing it out, using your own sites.