People and site compliance

Site issue register software for construction

Crate's site issue register gives every site one place to log, track and close out issues. Anyone on site can log an issue from their phone and gets a reference to follow it up, and each one carries a category, priority and due date until it is completed.

  • Logged on site from a phone
  • A reference for every issue
  • Full history, logged to completed
Site supervisor in a black safety helmet and yellow hi-vis jacket logging an issue on his phone, beside a Crate confirmation with the issue reference for follow-up
Logged on the spot

Anyone on site logs an issue from their phone and gets a reference.

Category, priority, due date

Every issue says what kind it is, how urgent it is and when it is due.

Open or completed

Site teams see the open issues on their own site.

Every site in one view

Managers see what is outstanding across all sites.

How a site issue register works in Crate: one rebar issue

Follow one quality issue from the moment it is spotted to the day it is closed out.

  1. 09:10

    Spotted and logged from a phone

    Supervisor Mark Davies spots rebar out of position on a column in block A. He logs it on his phone as a quality issue and gets reference SI-123-456 to follow it up.

    OpenReference SI-123-456
  2. 09:40

    Given a priority and a due date

    Site manager Daniel Hughes sets it to high priority, due on Thursday, before the column is poured. The site team can see it with the other open issues on Riverside Quarter.

    High priorityDue 15/10/2026
  3. Tuesday

    Put right on site

    Aleksander Nowak from Kestrel Rebar refixes the bars to the drawing. The issue stays open until the work has been checked.

    OpenDue in 2 days
  4. Wednesday

    Completed, with the history kept

    Mark checks the column and marks the issue completed, a day before it was due. The register keeps the full history, from when it was logged to when it was completed.

    CompletedCompleted 14/10/2026

What is a site issue register?

A site issue register is the list of everything on site that needs putting right, from quality defects to damage. Each issue is recorded with what it is, how urgent it is and when it must be fixed by, and it stays on the register until it is closed.

On most sites, issues are reported in WhatsApp groups, emails, texts and a spreadsheet someone updates when they get a minute. Messages get buried, nobody is sure what is still open, and when someone asks how a defect was dealt with, the answer is spread across a dozen threads.

Crate's site issue register puts every issue in one place. Anyone on site logs it from their phone and gets a reference, it is given a category, priority and due date, and it stays open until it is completed, with the full history kept.

What every issue in Crate carries

  • A reference to follow it up
  • A category, such as quality
  • The site it belongs to
  • A priority and a due date
  • An open or completed status
  • The full history, from logged to completed

Site teams see the open issues on their own site. Managers see every site.

One site issue register, from the phone to the office

Anyone on site can log an issue. Site teams work through what is open. Managers see what is outstanding across every site.

Every issue, open or completed

See every issue with its category, priority, due date and status, and switch between open and completed. Open any issue to see who logged it, when, and what has happened since.

Logged on the spot, with a reference

Whoever spots the problem logs it from their phone there and then, and gets a reference to follow it up. No waiting until they are back in the cabin, and no message lost in a group chat.

  • Logged on site from a phone
  • A reference for every issue
  • Open issues on their own site to work through

The full history of every issue

Each issue produces a record with its category, site, priority, due date and status, and every step from when it was logged to when it was completed.

  • Every step with its date and time
  • Who logged it and who completed it
  • Ready to download as a PDF

A dated record of what was found and how it was fixed

In England, Part 2A of the Building Regulations 2010, brought in under the Building Safety Act, requires principal contractors to plan, manage and monitor building work so it complies. On higher-risk buildings, government golden thread guidance adds that the principal contractor must keep evidence that the building work meets building regulations.

A site issue register is part of how you show that monitoring happened. Crate keeps a dated record of every quality issue against its site, from the day it was logged to the day it was completed, supporting your golden thread information and Building Safety Act evidence.

Crate is not a golden thread system and does not make anyone compliant. It keeps dated, named records that support your evidence. Take advice on what your projects need.

"The principal contractor must… plan, manage and monitor the building work during the construction phase, and… coordinate matters relating to the building work comprised in the project to ensure the building work is in compliance with all relevant requirements."

Building Regulations 2010, regulation 11N(1)
Regulation 11NPrincipal contractors plan, manage and monitor building work so it complies
18 metresOr 7 storeys, the height at which a building with 2 or more homes, or a hospital or care home, is higher-risk

Last updated October 2026

What to record for every site issue

The details that make an issue easy to fix, easy to follow up and easy to prove was dealt with.

DetailWhy it matters
What and whereA clear description and an exact location, such as the level, gridline or room, so whoever fixes it does not have to go looking.
CategoryGrouping issues, such as quality, safety or environmental, shows where problems keep coming from.
PriorityPuts the most serious issues first, such as anything that is about to be covered up or poses a risk to people.
Who owns itOne named person or company responsible for putting it right, so it does not fall between trades.
Due dateSets when it must be fixed by, ideally before the next stage of work hides it.
Evidence of the fixA note or photo showing the work was put right, so the fix can be checked later.
Date closedShows when the issue was resolved and how long it stayed open, which matters at audits and handover.

General guidance for any issue register, paper or digital. Your contract, quality plan or client may ask for more.

WhatsApp, emails and spreadsheets versus a site issue register in Crate

The same issues, kept in one place everyone who needs them can see.

QuestionWhatsApp, emails and spreadsheetsSite issue register in Crate
Reporting an issueA WhatsApp message, an email or a word in the cabinLogged from a phone, with a reference
Knowing what is still openScrolling back through chats and threadsEvery issue shows as open or completed
What comes firstWhoever shouts loudestA priority and due date on every issue
Site teamsUpdates lost in a busy group chatSee the open issues on their own site
ManagersA spreadsheet updated when someone has timeSee what is outstanding across all sites
The recordSpread across phones and inboxesFull history from logged to completed
Steel fixer in a white safety helmet and hi-vis vest working on a rebar cage, beside a Crate quality issue marked open and high priority with a due date

Know what needs fixing first

Each issue carries a category, such as quality, a site, a priority and a due date. Site teams can see every open issue on their site and work through the highest priority first, while managers keep track of what is outstanding across all sites.

  • Category, site, priority and due date
  • Open issues for each site team
  • Every site in one view for managers

Closed out, with the record kept

Once the work is put right, the issue is marked completed. The site issue register keeps a clear record of what was found, when it was logged and when it was completed, so you can show how it was dealt with when someone asks.

  • Marked completed when the work is put right
  • Full history from logged to completed
  • Dated records that support Building Safety Act evidence
Steel fixer photographing a finished rebar column on his phone, beside the same Crate quality issue now marked completed

Questions about the site issue register

Straight answers to what construction teams ask us most.

What is a site issue register?

A site issue register is a list of every issue on site that needs putting right, with what it is, how urgent it is, when it is due and whether it has been dealt with. In Crate, anyone on site can log an issue from their phone, and it stays on the register until it is completed.

Who can log an issue?

Anyone on site can log an issue in Crate from their phone. They get a reference as soon as it is logged, so they can follow it up.

What information does each issue have?

Each issue has a category, such as quality, the site it belongs to, a priority and a due date. Its status shows whether it is open or completed.

Can managers see issues across all sites?

Yes. Site teams see the open issues on their own site, and managers can keep track of what is outstanding across all sites.

What is the difference between a site issue register and a snagging list?

A snagging list usually covers defects found close to handover. A site issue register runs for the whole job and covers any issue that needs putting right, from quality defects to damage.

How does a site issue register support the Building Safety Act?

Principal contractors must plan, manage and monitor building work so it complies with all relevant requirements, and on higher-risk buildings they must keep evidence that the work meets building regulations. A dated record of quality issues and how they were resolved supports that evidence and your golden thread information. Take advice on what your projects need.

Can we stop reporting site issues on WhatsApp?

Yes. With every issue logged in Crate with a reference, a priority and a due date, there is one place to see what is still open, instead of messages spread across group chats.

What happens when an issue is fixed?

It is marked completed. The full history stays in the site issue register, from when the issue was logged to when it was completed.

Nothing lost between finding it and fixing it.

Book a demo and we'll show you the site issue register in Crate, from logging an issue on a phone to closing it out, using your own sites.