People and site compliance

Site safety inspection software for construction

Crate turns every site safety inspection into a checklist you complete on a tablet or phone as you walk the site. Mark each question as you check it, create an action the moment something is wrong, and get an overall score and rating when you submit the tour.

  • On a tablet or phone
  • Actions raised on the spot
  • Scored when submitted
Health and safety advisor in a white safety helmet and hi-vis vest walking with a tablet, beside a Crate card showing a submitted site tour scored 27 out of 36, rated good
A checklist in your hand

Walk the site with the checklist on a tablet or phone, not a clipboard.

Marked as you go

Each question is marked at the moment it is checked.

Actions there and then

A non-compliant answer becomes an action, assigned and followed up.

Scored and rated

Every tour gets a score and rating, kept in one list for the site.

How a site safety inspection works in Crate: one Thursday morning tour

Follow one tour of Riverside Quarter, from the first question to the last action closed.

  1. 08:40

    Priya starts the tour

    Priya Sharma opens the site tour checklist for Riverside Quarter on her tablet and starts walking the site from the main gate.

    StartedRiverside Quarter, Leeds
  2. 09:12

    An out of date scaffold tag

    At the Gate 2 scaffold, the inspection tag is out of date. She marks the question non-compliant and creates an action there and then, assigned to Apex Scaffolding.

    Action raisedScaffold tags, non-compliant
  3. 10:05

    Submitted, scored and rated

    She checks the last question and submits the tour. It gets its overall score and rating straight away: 27 out of 36, 75%, rated good.

    Submitted27/36, 75%, Good
  4. 13:10

    The action is closed

    The scaffold is re-inspected and a new tag goes up, so the action is closed. The tour keeps the record of what was found, who it was assigned to and when it was put right.

    Action closed1 action, closed

What is a site safety inspection?

A site safety inspection, often called a site safety tour, is a planned walk around a construction site to check that work is being done safely: access routes, scaffolding, edge protection, housekeeping, PPE, plant and welfare.

On most sites it is still done with a clipboard and a printed checklist. Findings are typed up later, actions get lost between the paperwork and the people who need to fix them, and comparing one site with another means chasing spreadsheets.

In Crate, the site safety inspection is a checklist on a tablet or phone. Each question is marked as it is checked, problems become actions on the spot, and every submitted tour gets an overall score and rating.

What a site tour in Crate gives you

  • A checklist completed on a tablet or phone
  • Each question marked as it is checked
  • Actions created from non-compliant answers
  • An overall score and rating when submitted
  • Every tour kept in one list for each site
  • Scores you can follow from tour to tour

Every tour is saved against its site and date, so you can see how standards change.

One site safety inspection, from the tablet to the office

Inspectors work through the checklist on site. Managers see every tour's score and rating. Each tour keeps a record of what was found and what was done about it.

Every tour, scored and rated

See each tour on a site with who carried it out, when it was submitted, its overall score and its rating. Open a tour to see the actions it raised and whether they have been closed.

Mark each question as you walk

The checklist is on the tablet or phone in your hand. Mark each question as you check it, and when something is non-compliant, create an action before you move on.

  • The checklist in your hand as you walk
  • Compliant or non-compliant, marked on the spot
  • An action created from any non-compliant answer

A clear record of every tour

Each submitted tour keeps a record of who carried it out and when, its overall score and rating, the areas checked and the actions raised, with who they were assigned to and whether they are closed.

  • Who carried out the tour, and when
  • The overall score and rating
  • Every action raised, with its status

CDM 2015 expects the construction phase to be monitored

Under CDM 2015, the principal contractor must plan, manage and monitor the construction phase and coordinate health and safety during it. Every contractor has a matching duty for the work they and their workers carry out.

Regular site safety inspections are one of the main ways site teams monitor what is happening on site. A dated record of each tour, what it found and what was done about it, helps show that monitoring took place. On higher-risk buildings, those records can also sit alongside your Building Safety Act evidence.

Crate records your site tours and the actions they raise. It does not set your inspection regime and does not make a site compliant. Take advice on what your projects need.

"The principal contractor must plan, manage and monitor the construction phase… to ensure that, so far as is reasonably practicable, construction work is carried out without risks to health or safety."

Construction (Design and Management) Regulations 2015, regulation 13(1)
Regulation 13The principal contractor plans, manages and monitors the construction phase
Regulation 15Each contractor plans, manages and monitors the work under their control

Last updated October 2026

What to check on a construction site safety inspection

The areas most site tours cover, and what good looks like in each.

AreaWhat to look for
Access and egressRoutes in and around the site are clear, signed and lit, and kept apart from plant where possible.
Scaffolding and tagsScaffolds have been inspected by a competent person, tags are in place and in date, and guard rails, toe boards and ladders are secure.
Edge protectionOpen edges, stairwells, floor openings and roof edges are protected, and any covers are fixed and marked.
HousekeepingWalkways and work areas are clear of materials, waste and trip hazards, and waste is removed regularly.
PPEPeople are wearing the PPE their task and the site rules call for, and it is in good condition.
Plant and segregationPeople and plant are kept apart with barriers and marked routes, with a banksman or traffic marshal where needed.
ExcavationsSides are supported or battered back, edges are protected, and inspections are up to date.
Fire pointsFire points are stocked, signed and unobstructed, and escape routes are clear.
WelfareToilets, washing facilities, drinking water and rest areas are clean, stocked and working.
COSHH storageHazardous substances are stored securely and labelled, with safety data sheets and assessments to hand.

A starting point for your own checklist. What you check depends on the site, the stage of work and your risk assessments.

Clipboard inspections versus site safety inspections in Crate

The same walk around the site, with nothing left to type up and nothing left on the clipboard.

QuestionClipboard inspectionsSite safety inspections in Crate
The checklistPrinted sheets, often an old versionOn a tablet or phone
Marking each checkTicked on paper, typed up laterMarked on the spot, as each question is checked
Problems foundWritten down and easy to forgetAn action there and then, assigned and followed up
ScoringWorked out by hand, if at allAn overall score and rating when the tour is submitted
Tracking standardsSpreadsheets pieced together each monthEvery tour and its score in one list
Finding a past tourA box file in the site cabinSaved against the site and date
Health and safety advisor checking a scaffold inspection tag during a site tour, beside a Crate checklist question marked non-compliant with an option to create an action

Raise the action before you walk away

When a scaffold tag is out of date, or anything else fails a check, the inspector marks it non-compliant and creates an action on the spot. It is assigned and followed up, instead of being written on a clipboard and forgotten.

  • Every question marked as it is checked
  • Actions created from non-compliant answers
  • Each action assigned and followed up

Questions about site safety inspections

Straight answers to what construction teams ask us most.

What is a site safety inspection?

A site safety inspection, or site safety tour, is a planned walk around a construction site to check that work is being carried out safely. In Crate, it is a checklist completed on a tablet or phone, with each question marked as it is checked.

What is the difference between a site safety tour and a site inspection?

The terms are often used for the same thing: walking the site against a checklist and recording what you find. Some teams use tour for a manager's walkround and inspection for a more detailed check. In Crate, both are run as site tours.

How often should you carry out a site safety inspection?

There is no single legal frequency for general site safety tours. Many teams set a regular pattern, such as weekly, based on the size of the site, the stage of work and the risks. Some equipment and work, such as scaffolds and excavations, has its own inspection rules. Take advice on what your sites need.

Can I raise actions during a site tour?

Yes. When a question is marked non-compliant, the inspector can create an action there and then, so it is assigned and followed up rather than left on a clipboard.

Does each site tour get a score?

Yes. Every tour gets an overall score and rating as soon as it is submitted, for example 27 out of 36, 75%, rated good.

Can I see how site safety inspections change over time?

Yes. Every tour is scored and rated when it is submitted, and each site's tours sit in one list with their scores, so you can see how standards change from tour to tour.

Do site tours work on a tablet and a phone?

Yes. Site tours are completed on a tablet or phone while you walk the site, so there is nothing to type up back in the cabin.

Does CDM 2015 require site safety inspections?

CDM 2015 does not use the term site safety inspection. Regulation 13 says the principal contractor must plan, manage and monitor the construction phase, and regulation 15 gives contractors a similar duty for their own work. Regular inspections are a common way of monitoring. Take advice on how the duties apply to your projects.

Every tour scored. Every finding followed up.

Book a demo and we'll walk you through a site safety inspection in Crate, from the first question on the tablet to the last action closed.

Book a demo