People and site compliance

Toolbox talk software for construction sites

Crate gives every site a library of toolbox talk templates, so supervisors can pick the right talk, deliver it from a phone or tablet and record who attended. Workers sign on the device, and each completed talk is saved against the site with the number who signed.

  • Templates for each site
  • Delivered from a phone or tablet
  • Signed on the device
Site supervisor in a black safety helmet and orange hi-vis holding a phone, beside a Crate card showing an active working at height ladder safety toolbox talk template for Riverside site
A library for each site

Templates set up for each site, each with the dates it is valid for.

Delivered on the spot

Supervisors run the talk from a phone or tablet, wherever the team is.

Signed on the device

Workers sign to confirm they attended. No sign-in sheets to chase.

Records by site

Completed talks listed by site and briefing type, ready to download.

How a toolbox talk works in Crate: one Monday morning

Follow one ladder safety talk from the template library to a signed record.

  1. 07:15

    Mark picks the talk

    Ladder work starts on Riverside Quarter this week. Mark Davies opens the site's templates on his phone and chooses working at height, ladder safety, valid until the end of March.

    Template chosenValid to 31/03/2027
  2. 07:30

    He delivers it where the team is

    Mark gathers ten operatives outside the site cabin and takes them through the talk from his phone, with the template's content in front of him.

    In progressDelivered by Mark Davies
  3. 07:41

    Everyone signs on the device

    When the talk ends, each worker signs on Mark's phone to confirm they attended. The attendance list fills as they go.

    Signing4 of 10 signed
  4. 07:48

    Completed, with 10 signed

    The talk is saved against Riverside Quarter as completed, with the date and the 10 operatives who signed. The site manager sees it in the list and can download the record.

    Completed10 of 10 signed

What is a toolbox talk?

A toolbox talk is a short, informal safety talk given to a team on site, usually by their supervisor. Each one covers a single topic that matters to the work in hand, such as ladder safety, silica dust or manual handling.

On paper, it means a printed talk, a sign-in sheet on a clipboard and a folder in the cabin. Old copies stay in circulation, names are hard to read, and when someone asks who was briefed on what, the answer is a search through box files.

With Crate, each site has its own library of toolbox talk templates. Supervisors deliver the talk from a phone or tablet, workers sign on the device, and every completed talk is saved against the site with the number who signed.

What each record shows

  • The site the talk was given on
  • The template and topic used
  • The date and time it was given
  • Who attended
  • A signature from each worker
  • The number of operatives who signed

Completed talks are listed by site and briefing type, ready to download.

Every toolbox talk, from the template to the signed record

Site managers see the templates and every completed talk. Supervisors deliver from their phone. You keep a record of each talk and who signed it.

Templates and completed talks in one place

Each site's active templates sit beside the talks already delivered, with who gave each one, the date and how many operatives signed. Filter by site and briefing type, and download the records when you need them.

Delivered from the supervisor's phone

Supervisors open the talk on their phone or tablet, take the team through it and hand the device round for signatures. The attendance list shows who has signed and who still needs to.

  • The site's templates, ready to use
  • Each template shows its valid dates
  • Workers sign on the device

A record of every talk and who signed

Each completed talk keeps the site, the template used, who delivered it and when, and every operative who signed. When a client or auditor asks who was briefed on ladder safety, the answer takes seconds.

  • Site, date and template on every record
  • Each worker's name, employer and signature
  • Ready to download

Sign a toolbox talk by QR code

When the talk ends, nobody should be waiting in line to sign one phone. Crate gives your team two ways to sign each toolbox talk, and both keep the same record.

Supervisor app

Scan their passport, sign on one screen

The supervisor scans each operative's passport QR code in the supervisor app, then everyone signs on the supervisor's screen. No sign-in sheet and no typing names.

Their own phone

Scan the QR code, sign on their own phone

Operatives scan the QR code with their own phone and sign the toolbox talk from their passport in the Crate app, all at the same time.

Less queuing

Scan and sign on one screen, or let the whole team sign at once on their own phones.

The same record, either way

Both routes save the signed toolbox talk, with each person's name and the time they signed.

On their own phone, in their passport

Every signed toolbox talk shows in the operative's passport, so they can view the record on their own phone at any time.

Toolbox talks in their own language

Not everyone on site has English as a first language. Operatives can open the toolbox talk on their own phone, translated into their own language, and read along as the supervisor delivers it.

Afterwards, the signed record stays in their passport, so they can look back at what was covered at any time.

  • Translated into the operative's own language
  • Read along on their own phone as it is delivered
  • The signed record on their own phone afterwards

Workers need to know the risks and the controls

Under regulation 10 of the Management of Health and Safety at Work Regulations 1999, employers must give employees comprehensible and relevant information on the risks identified by their risk assessment and the measures that control them. Regulation 13 expects health and safety training to be repeated periodically where appropriate, and adapted to new or changed risks.

A toolbox talk is one of the most common ways construction teams keep that information fresh. A dated record of who attended shows it happened. Kept against the site, it also supports the evidence you hold for the Building Safety Act.

A toolbox talk does not replace RAMS, site inductions or the training a job needs. Take advice on what your sites need.

"Every employer shall provide his employees with comprehensible and relevant information on… the risks to their health and safety identified by the assessment… the preventive and protective measures…"

Management of Health and Safety at Work Regulations 1999, regulation 10(1)(a) and (b)
Regulation 10Comprehensible and relevant information on risks and controls
Regulation 13Training repeated periodically where appropriate

Last updated October 2026

Common construction toolbox talk topics

The topics site teams cover most often, and why each one matters.

TopicWhy it matters
Working at heightFalls from height are one of the most common causes of death and serious injury in construction.
LaddersCovers when a ladder is the right choice, checking it before use and setting it up safely.
Manual handlingLifting and carrying are a common cause of back injuries and other musculoskeletal disorders on site.
Dust and silicaCutting, drilling and grinding concrete, brick and stone can release silica dust, which can cause serious lung disease.
NoiseLoud tools and plant can cause permanent hearing damage, so controls and hearing protection matter.
Hand-arm vibrationRegular use of vibrating tools can lead to hand-arm vibration syndrome and carpal tunnel syndrome.
ExcavationsCollapses, buried services and falls into excavations can kill or seriously injure.
Slips and tripsAmong the most common causes of injury on site, often down to poor housekeeping and uneven ground.
PPECovers what to wear for the task, how to check it and how to look after it.
COSHHSubstances such as cement, solvents and adhesives can harm skin and lungs without the right controls.
Plant and peopleKeeping people and moving plant apart prevents some of the most serious accidents on site.

Choose topics that match the work on site. HSE construction guidance covers each of these in more detail. Last checked October 2026.

Paper sign-in sheets versus toolbox talks in Crate

The same talk, with a record you can find again.

QuestionPaper sign-in sheetsToolbox talks in Crate
Choosing the talkWhatever printed talk is in the folderA library of templates set up for each site
Keeping content currentOld copies stay in circulationEach template shows the dates it is valid for
Recording attendanceNames scrawled on a clipboardEach worker signs on the device
Finding a recordBox files in the site cabinListed by site and briefing type
Across sitesEach site keeps its own paperworkCompleted talks from every site in one place
When someone asks for evidenceA search through old sheetsDownload the records
Supervisor with a tablet delivering a toolbox talk to four construction workers outside a site cabin, beside a Crate list showing a completed ladder safety talk with 10 operatives signed

Give the talk where the team is working

Supervisors can deliver a toolbox talk outside the cabin, at the gate or at the work area, with the talk on a tablet and the team around them. Workers sign on the device when it finishes, and the completed talk joins the list for that site with the number who signed.

  • Delivered from a phone or tablet
  • Signed by every worker on the device
  • Saved by site and briefing type

Questions about toolbox talks

Straight answers to what construction teams ask us most.

What is a toolbox talk?

A toolbox talk is a short safety talk given to a team on site, usually by their supervisor, on one topic that matters to the work they are doing. In Crate, supervisors deliver toolbox talks from a phone or tablet using templates set up for their site, and workers sign to confirm they attended.

How long should a toolbox talk last?

Most last around 10 to 15 minutes. They work best when they are short, focus on one topic and link to the work the team is doing that week.

Is a toolbox talk a legal requirement?

No law names toolbox talks. Employers must give employees comprehensible and relevant information on the risks to their health and safety and the measures that control them, under regulation 10 of the Management of Health and Safety at Work Regulations 1999, and CDM 2015 requires contractors to give workers appropriate supervision, instructions and information. Toolbox talks are a common way to help meet those duties. Take advice on what your sites need.

Can each site have its own toolbox talks?

Yes. Each site has its own library of toolbox talk templates, such as working at height or manual handling, and each template shows the dates it is valid for.

How do workers sign a toolbox talk in Crate?

Two ways. The supervisor can scan each worker's passport QR code and everyone signs on the supervisor's phone or tablet, or workers scan the QR code with their own phone and sign in the Crate app. Each signed toolbox talk is saved with the talk and shows in the worker's passport.

Can I see toolbox talks across all my sites?

Yes. Completed talks are listed by site and briefing type, with the date and the number of operatives who signed, so site managers and health and safety teams can see what has been delivered on every site.

Can I download toolbox talk records?

Yes. You can download the records of completed toolbox talks when a client, principal contractor or auditor asks for evidence that the workforce has been briefed.

What is the difference between a toolbox talk and a daily activity briefing?

A toolbox talk covers one health and safety topic in more depth, such as ladder safety or silica dust. A daily activity briefing covers the day's tasks, hazards and controls on a site. Crate records each as its own briefing type.

Can workers follow a toolbox talk in their own language?

Yes. Workers can open the toolbox talk on their own phone, translated into their own language, and read along as it is delivered. The signed record then stays in their passport.

Every talk delivered, signed and on record.

Book a demo and we'll show you how a toolbox talk runs in Crate, from your site's templates to the signed record, using your own sites and topics.

Book a demo